not depend on the secret of spring snow on unpredictable summer monsoons and typhoons boris maksutov mikhail devyatkins, khabarovsk territory. in the moscow region ahead of schedule will build a new fast track. it will unload the moscow ring road and large cities that adjoin the capital lytkarino lyubertsy balashikha, the length of the road is 45 km. maria slobodyanskaya visited the construction site as early as 1925 as the first car that could be driven on. the track itself will take its start in butovo and continue all the way to lyubertsy well, i must say that the construction, of course, is very large-scale and now only the first slime car that i scored, you see behind my back, and a lot of work is planned until the age of 26, i must say that she it is designed for several stages, which will take place in parallel. here is the first - this is a building. actually the bridge. in this area, it should be handed over on time in the twenty-sixth year, the second stage is a link of this south lytkarinsky highway with another strategic highway m12, moscow kazan and the north of the eastern chord and also