ensures the delivery of extracted resources from the fields of western siberia, as well as from the bovanenkovskoye field in yamal to the west of the country russian regions are thousands of kilometers, and if all the lines for which it is responsible are added into one, you get 17,000 km, but gazprom transgaz, ukhta will operate 14 compressor stations like that , well, we have one of the largest branches. we have seven compressor workshops and all the lines of the main gas pipeline pass through us. here, starting , uh, tukhta, torzhok one autotorzhok, two torzhok three fugouts, dirt and threads that are already coming here are new , also this is ukhta torzhok one. uh, ukhta is called a dirty wire and ukhta torzhok is two imal. uh, that is various pressure systems. this is starting from the fifty-fifth system, that is, 55 e kilograms of forces per centimeter squared, and ending with 100 kg of a large gas transport mechanism. well , a pipe is not all that is needed to deliver gas to the consumer on its own to go quickly. it can not provide the necessary pressure to be literally pushed forward throug