i want to thank the port and specifically brad vincent for working with us closely to come up with a project at pier 70, the electrification of an additional dry dock for maintenance of cruise ships and military vessels that will offset the emissions from the decommissioning of shoreside power. that is a major project that will have incredible air quality benefits during the america's cup. the cruise ship terminal construction and beyond, particularly when shoreside power comes back on board. it is definitely a win for the environment, and we thank you all for that. having said that, some of the additional air quality measures i wanted to call out that i would recommend and incorporate into the mmrp are a commitment to clean a marine fuel, and since for marine vessels and construction -- engines for marine vessels and construction equipment. these are all the and mitigation measures that you may be adopting today, as feasible, so that gives us a lot of confidence this will go forward. in addition, there are some remaining in farm the concerns -- environmental concerns. they're mostly