this site was not posted in compliance with the rules. 801 brannan has one building site on 7th street. this is the secondary entrance and this was ripped off. six days after the document was released, the only visible sign, if you walk around the block, the building itself was not posted. nobody knows what this is like, going through this process. the concourse is where this is held and nobody knows about this. the building was finally posted on the sixth of july. a couple of weeks later -- they should have had 60 days of commons because of the scope of the project. it was given 45 days and most of them did not have postings on the most critical building the public is interested in, people go to this but did not know that this is going to be demolished. that is my time. this is an 824 dwelling unit project, with 799 parking spaces. they are planning something i have never seen, they say that they will have extra parking because of the contractual obligation because of the prior sales of the property. this basically has one ownership, and they have contracted the sale. they say they ne