the german command to force the city on the neva to capitulate failed on september 8th. 1967 the bratskayaeration; the project was declared a shock komsomol construction project construction. took 13 years. at that time, the station with a capacity of 4.100. mw, was the world's largest this title. it kept it for 4 years, then reached its full capacity, the krasnoyarsk hydroelectric power station was filled with the bratsk reservoir for the operation of the station, which became the world's largest artificial reservoir. true, 300,000 hectares of forest and agricultural land had to be flooded and almost 70,000 people from 250 villages and villages were resettled. now the station on the angara in the irkutsk region, the third in terms of capacity and the first intermediary generation of electricity in russia september 8, 2007 in scotland, a monument to the cruiser varyag was solemnly opened. a three-meter bronze cross was installed on the shores of the irish sea in the village of landel food near the place of the death of the ship, the author of the monument. danila surovtsev depicted the cru