francisco, in shelters on both islands, and the ferry terminal would be constructed, including dogs, breakwatersnetwork of bicycle and other paths connecting the islands. infrastructure improvements including new or upgraded distribution piping from the island, but new tanks, a recycled water treatment plant with a recycle water for irrigation and appropriate clothing facilities, commercial and residential buildings on treasure island, new were waste water collection, a new waste- water treatment plant, near the electricity, natural gas, and a communications facility in solar power generation facility. the proposed project in prince seismic safety. components include a stabilization of the causeway connecting the islands, and there would be it's film where the buildings and roads are proposed. there will be long-term protection against flooding, including an allowance for the estimated potential future sea level rise. strengthening the perimeter berm around treasure island, and repairing the retaining wall for the yerba buena island. as noted, and number of revisions have occurred since the draf