profession, i am actually from polesie, brest region areas, lunetskogo district, was the head of the pmk, in 2002 the republican leadership transferred me here as general directorimself sent us this object, an object valuable to us, exactly... a year later we began to take part in this construction. in 2004, when reconstruction began, there were immediately excavators, earth-moving equipment, equipment for leveling the soil in order to break through the channel along the entire length of the 22 km canal, and at the same time people began to work on restoring... structures, the object was in a very deplorable condition, it was necessary to find the best option to bring it all into working order, the shipping and culvert locks were faulty , blocks had fallen off, overgrown with bushes, overgrown with forests, rotten wooden structures, the channel bed was in a swamp, it was not visible, where is the real riverbed, everything is so overgrown, the whole region worked for us, i had 83 contractors, over 90 excavators, over 300 pieces of equipment worked for us during this time, it was a huge construction project, this so many people, so many discussions, that’s it, af