SFGTV: San Francisco Government Television
0
0.0
Mar 10, 2025
03/25
by
SFGTV
tv
eye 0
favorite 0
quote 0
that's created so it's an overall plan that guides the whole development of treasure island and the buena island. >> materials used during the construction of treasure island severely compromises the integrity to build structures. in today's geotechnical engineers standing, treasure island soil is being readdressed for soil stabilization for future development. a mechanical stabilization process is being used to consolidate the liquid fashion of the mud and sandy soil. >> because treasure island is a manmade island, we have to do a significant amount of soil improvement before we can build new infrastructure and new buildings on the island. in the foreground, you see here, it's a process called surcharging we we import additional topsoil to simulate the dead weight of the future buildings to be constructed at that site. so this is causing bay mud that underlies island to consolidate over time and we can monitor that and as that consolidation primarily consolidation is complete, then this soil will be removed to the intended finished floor elevation of the new structures. ♪ [ music ] ♪ ♪ >> in th
that's created so it's an overall plan that guides the whole development of treasure island and the buena island. >> materials used during the construction of treasure island severely compromises the integrity to build structures. in today's geotechnical engineers standing, treasure island soil is being readdressed for soil stabilization for future development. a mechanical stabilization process is being used to consolidate the liquid fashion of the mud and sandy soil. >> because...
SFGTV: San Francisco Government Television
0
0.0
Mar 5, 2025
03/25
by
SFGTV
tv
eye 0
favorite 0
quote 0
form water garden filtering systems, the first of three natural stormwater gardens is here on buena island will be on treasure island. water from storms, street runoffs from neighborhoods has the possibility to collect toxic materials as it makes its way back into the surrounding bay. this garden has been a model for future, natural filtering systems through out the bay area. >> whenever a storm comes through, all of the water, you know, it lands on the streets, it lands on the top of the buildings, and at times it often collects a lot of heavy metals and greases and it needs to be cleaned and before sent back into the back. it goes into the pipes and stormwater drainage and put into our stormwater basin and then all of the plants and soil you're seeing in there, they are acting as a filter for all those oils and heavy metals and greases and all things that's coming off the roadways, coming off the development and so it's treated here in the storm water basin and then it's sent out into the bay as a clearer product and cleaner water which increases our water quality here and throughout the
form water garden filtering systems, the first of three natural stormwater gardens is here on buena island will be on treasure island. water from storms, street runoffs from neighborhoods has the possibility to collect toxic materials as it makes its way back into the surrounding bay. this garden has been a model for future, natural filtering systems through out the bay area. >> whenever a storm comes through, all of the water, you know, it lands on the streets, it lands on the top of the...
SFGTV: San Francisco Government Television
0
0.0
Mar 9, 2025
03/25
by
SFGTV
tv
eye 0
favorite 0
quote 0
form water garden filtering systems, the first of three natural stormwater gardens is here on buena islandl of ten will be on treasure island. water from storms, street runoffs from neighborhoods has the possibility to collect toxic materials as it makes its way back into the surrounding bay. this garden has been a model for future, natural filtering systems through out the bay area. >> whenever a storm comes through, all of the water, you know, it lands on the streets, it lands on the top of the buildings, and at times it often collects a lot of heavy metals and greases and it needs to be cleaned and before sent back into the back. it goes into the pipes and stormwater drainage and put into our stormwater basin and then all of the plants and soil you're seeing in there, they are acting as a filter for all those oils and heavy metals and greases and all things that's coming off the roadways, coming off the development and so it's treated here in the storm water basin and then it's sent out into the bay as a clearer product and cleaner water which increases our water quality here and throug
form water garden filtering systems, the first of three natural stormwater gardens is here on buena islandl of ten will be on treasure island. water from storms, street runoffs from neighborhoods has the possibility to collect toxic materials as it makes its way back into the surrounding bay. this garden has been a model for future, natural filtering systems through out the bay area. >> whenever a storm comes through, all of the water, you know, it lands on the streets, it lands on the...
SFGTV: San Francisco Government Television
0
0.0
Mar 11, 2025
03/25
by
SFGTV
tv
eye 0
favorite 0
quote 0
form water garden filtering systems, the first of three natural stormwater gardens is here on buena islandof ten will be on treasure island. water from storms, street runoffs from neighborhoods has the possibility to collect toxic materials as it makes its way back into the surrounding bay. this garden has been a model for future, natural filtering systems through out the bay area. >> whenever a storm comes through, all of the water, you know, it lands on the streets, it lands on the top of the buildings, and at times it often collects a lot of heavy metals and greases and it needs to be cleaned and before sent back into the back. it goes into the pipes and stormwater drainage and put into our stormwater basin and then all of the plants and soil you're seeing in there, they are acting as a filter for all those oils and heavy metals and greases and all things that's coming off the roadways, coming off the development and so it's treated here in the storm water basin and then it's sent out into the bay as a clearer product and cleaner water which increases our water quality here and througho
form water garden filtering systems, the first of three natural stormwater gardens is here on buena islandof ten will be on treasure island. water from storms, street runoffs from neighborhoods has the possibility to collect toxic materials as it makes its way back into the surrounding bay. this garden has been a model for future, natural filtering systems through out the bay area. >> whenever a storm comes through, all of the water, you know, it lands on the streets, it lands on the top...
SFGTV: San Francisco Government Television
0
0.0
Mar 5, 2025
03/25
by
SFGTV
tv
eye 0
favorite 0
quote 0
for treasure island development authority utility system customers on treasure island and yerba buena island. >> 60 resolution to recommend to the board of supervisors that it a approve the grant deed for the real property located on a portion of your boat bueno island upon which the mccall sanitary sewer pump station on mccall road has been built. be approved the developers a record of a irrevocable offers for four sanitary sewer pump stations with two located on y by known as mccall a sanitary sewer pump station on mccollough road and northgate sanitary sewer pump station on northgate road and two on treasure island known as the bruton sanitary sewer pump station on bruton street and kravitz sanitary sewer pump station on kravitz street. c dedicate the aforementioned pump stations for public use d designate the offer mention pump stations for utility purposes and e except formation pump stations for city maintenance and liability purposes subject to certain conditions and adopt environmental findings for purposes of the authorities action. >> are there any items that the board would like t
for treasure island development authority utility system customers on treasure island and yerba buena island. >> 60 resolution to recommend to the board of supervisors that it a approve the grant deed for the real property located on a portion of your boat bueno island upon which the mccall sanitary sewer pump station on mccall road has been built. be approved the developers a record of a irrevocable offers for four sanitary sewer pump stations with two located on y by known as mccall a...
SFGTV: San Francisco Government Television
0
0.0
Mar 7, 2025
03/25
by
SFGTV
tv
eye 0
favorite 0
quote 0
the second project is a free on island shuttle serving treasure island and yerba buena island. this service can take riders to destinations around the islands including the ferry terminal. the new parks on your boat bueno and the sailing center that are a little more difficult to access. >> the third is the enhanced muni service on the t5 line which serves treasure island and the procurement of an additional battery electric bus for use on a 25 line. that project will be delivered by s.f. mta. the program includes the construction of electric charging infrastructure at the treasure island ferry terminal. this facilitates the transition from the diesel service that is currently operating on an interim basis to fully electric and this project will be delivered by rita will expand the bay wheels bike share system to treasure island and our project also includes memberships for residents and workers on the island during this period. and finally one treasure island will launch and operate the transportation resource center which combines three priority recommendations from the supple
the second project is a free on island shuttle serving treasure island and yerba buena island. this service can take riders to destinations around the islands including the ferry terminal. the new parks on your boat bueno and the sailing center that are a little more difficult to access. >> the third is the enhanced muni service on the t5 line which serves treasure island and the procurement of an additional battery electric bus for use on a 25 line. that project will be delivered by s.f....
SFGTV: San Francisco Government Television
0
0.0
Mar 1, 2025
03/25
by
SFGTV
tv
eye 0
favorite 0
quote 0
we are also seeing great progress with the infrastructure progress projects on yerba buena island ledby the transportation authority and title. i'm pleased to announce a $25 million conditional award recommended by the metropolitan transportation commission staff for the multimodal bay skyway project which includes our year before an island multi-use path . the multi-use path completes the vision of multimodal connections on our west side bridges and hillcrest projects that are currently underway. related to that work. last week i was able to attend the graduation ceremony as i often try to for the one treasure island construction training program and i'm pleased to hear that one of those graduates has actually been hired as an apprentice carpenter on our west side bridges project. it is wonderful to see the synergy between the training program and our construction projects. finally, i also wanted to take this opportunity to thank anne marie rogers for her work on tie to the past couple of years and to congratulate her on her retirement. i am a big anne marie rogers fan and while her
we are also seeing great progress with the infrastructure progress projects on yerba buena island ledby the transportation authority and title. i'm pleased to announce a $25 million conditional award recommended by the metropolitan transportation commission staff for the multimodal bay skyway project which includes our year before an island multi-use path . the multi-use path completes the vision of multimodal connections on our west side bridges and hillcrest projects that are currently...
SFGTV: San Francisco Government Television
0
0.0
Mar 3, 2025
03/25
by
SFGTV
tv
eye 0
favorite 0
quote 0
we are also seeing great progress with the infrastructure progress projects on yerba buena island ledby the transportation authority and title. i'm pleased to announce a $25 million conditional award recommended by the metropolitan transportation commission staff for the multimodal bay skyway project which includes our year before an island multi-use path . the multi-use path completes the vision of multimodal connections on our west side bridges and hillcrest projects that are currently underway. related to that work. last week i was able to attend the graduation ceremony as i often try to for the one treasure island construction training program and i'm pleased to hear that one of those graduates has actually been hired as an apprentice carpenter on our west side bridges project. it is wonderful to see the synergy between the training program and our construction projects. finally, i also wanted to take this opportunity to thank anne marie rogers for her work on tie to the past couple of years and to congratulate her on her retirement. i am a big anne marie rogers fan and while her
we are also seeing great progress with the infrastructure progress projects on yerba buena island ledby the transportation authority and title. i'm pleased to announce a $25 million conditional award recommended by the metropolitan transportation commission staff for the multimodal bay skyway project which includes our year before an island multi-use path . the multi-use path completes the vision of multimodal connections on our west side bridges and hillcrest projects that are currently...
0
0.0
Mar 10, 2025
03/25
by
KRON
tv
eye 0
favorite 0
quote 0
former teen kalen specs shun it's going to close from the yerba buena island tunnel to the end of the bridge from 8 in the evening until for the following morning. we're going to last through friday with work expected to be completed. this may. plumlee also the department of veterans affairs could start as soon as june. so a memo reportedly calls for report due to at the time, which could result and widespread productions. is reportedly trying to cut roughly 80,000 jobs. both democrats and republicans have warned against mass layoffs at the department. hundreds marching through san francisco's union square on international women's day. the group rallying for women's rights on saturday. a lot saying they feel like they are in extreme danger under the new administration. some of the main issues they're fighting for crude legal access to abortion, stopping violence against women and transgender rights. house republicans. they unveiled a spending plan that would fund the government through at least september 30th. the bill comes just a few days before a possible government shutdown. boost
former teen kalen specs shun it's going to close from the yerba buena island tunnel to the end of the bridge from 8 in the evening until for the following morning. we're going to last through friday with work expected to be completed. this may. plumlee also the department of veterans affairs could start as soon as june. so a memo reportedly calls for report due to at the time, which could result and widespread productions. is reportedly trying to cut roughly 80,000 jobs. both democrats and...
0
0.0
Mar 10, 2025
03/25
by
KRON
tv
eye 0
favorite 0
quote 0
lanes will be closed tonight for routine cable inspection and maintenance be closed from the yerba buena islandto the end of the bridge from 8 in the evening until 4 in the morning. workers going to last through friday and it should all be done by may. the pittsburg bart station is the latest to get new fare. gates installed the station was closed this weekend for construction. it reopened this morning. this is all part of bart's plan to put new fare gates in all 50 stations, which is an effort to cut down on fare jumpers. the ork is expected to be all done by the end of this year. we're looking outside right now. this is pioneer trail. so we're seeing looks like if you're trying to get out to tahoe. lot of snow coming that way later on this week. let's see what qaeda has to say. yeah, that's right. so we have rain coming at tahoe has snow coming. this is a live look at yosemite right now. already kind of looking beautiful with its snow capped peaks from the last system that was rolling through things. pretty common tahoe at china peak as we take a live look there right now. temperatures at tha
lanes will be closed tonight for routine cable inspection and maintenance be closed from the yerba buena islandto the end of the bridge from 8 in the evening until 4 in the morning. workers going to last through friday and it should all be done by may. the pittsburg bart station is the latest to get new fare. gates installed the station was closed this weekend for construction. it reopened this morning. this is all part of bart's plan to put new fare gates in all 50 stations, which is an effort...
SFGTV: San Francisco Government Television
0
0.0
Mar 12, 2025
03/25
by
SFGTV
tv
eye 0
favorite 0
quote 0
multi-use path project for segments three and four and yerba buena island transit lane. this is an action item i thank you madam clerk. we have mr. cart holmes here to present. >> welcome. thank you, chair mcguire. chair melgar and vice chair souder and commissioners carl holmes, deputy director for capital projects s.f. gov we can please share the slides. so today we are coming to this board to request a contract amendment for the multi-use path on your bueno island. in november this board approved an action to start the design of this multiuse path which is a 2.2 mile pathway class one protected bicycle and pedestrian pedestrian pathway 16ft wide and you can see from this slide the proximity of other projects that we have currently in construction particularly the west side bridges and the hillcrest project. >> so today we are again seeking this contract amendment in the amount of $1.5 million to add for the left half of this multi-use path which is being designed by w h. the right half is being designed by t.y. lin. the left half will include a transit lane which will
multi-use path project for segments three and four and yerba buena island transit lane. this is an action item i thank you madam clerk. we have mr. cart holmes here to present. >> welcome. thank you, chair mcguire. chair melgar and vice chair souder and commissioners carl holmes, deputy director for capital projects s.f. gov we can please share the slides. so today we are coming to this board to request a contract amendment for the multi-use path on your bueno island. in november this...
SFGTV: San Francisco Government Television
0
0.0
Mar 10, 2025
03/25
by
SFGTV
tv
eye 0
favorite 0
quote 0
accepting irrevocable offers of public infrastructure associated with the treasure island and yerba buena island project for the bruton sanitary excuse me sanitary sewer pump station on bruton street and the cravath sanitary sewer pump station on cravath street both on treasure island and the mccullough sanitary sewer pump station on mccullough road and the north gate sanitary sewer pump station on north gate road both on nearby bueno island dedicating this infrastructure to public use designating it for utility purposes or accepting the public infrastructure for city maintenance and liability. approving a grant deed for the mcallen pump station adopting findings under sequoia making findings of consistency with the general plan in the eight priority policies of planning code section one and 1.1 and accepting a public works order recommending various actions in regard to the public infrastructure as well as authorizing official acts in connection with the ordinance. >> thank you so much, mr. clerk. we are now joined by a frequent guest of the ladies and chance rotation committee at district six
accepting irrevocable offers of public infrastructure associated with the treasure island and yerba buena island project for the bruton sanitary excuse me sanitary sewer pump station on bruton street and the cravath sanitary sewer pump station on cravath street both on treasure island and the mccullough sanitary sewer pump station on mccullough road and the north gate sanitary sewer pump station on north gate road both on nearby bueno island dedicating this infrastructure to public use...
SFGTV: San Francisco Government Television
0
0.0
Mar 11, 2025
03/25
by
SFGTV
tv
eye 0
favorite 0
quote 0
multi-use path project for segments three and four and yerba buena island transit lane. this is an action item i thank you madam clerk. we have mr. cart holmes here to present. >> welcome. thank you, chair mcguire. chair melgar and vice chair souder and commissioners carl holmes, deputy director for capital projects s.f. gov we can please share the slides. so today we are coming to this board to request a contract amendment for the multi-use path on your bueno island. in november this board approved an action to start the design of this multiuse path which is a 2.2 mile pathway class one protected bicycle and pedestrian pedestrian pathway 16ft wide and you can see from this slide the proximity of other projects that we have currently in construction particularly the west side bridges and the hillcrest project. >> so today we are again seeking this contract amendment in the amount of $1.5 million to add for the left half of this multi-use path which is being designed by w h. the right half is being designed by t.y. lin. the left half will include a transit lane which will
multi-use path project for segments three and four and yerba buena island transit lane. this is an action item i thank you madam clerk. we have mr. cart holmes here to present. >> welcome. thank you, chair mcguire. chair melgar and vice chair souder and commissioners carl holmes, deputy director for capital projects s.f. gov we can please share the slides. so today we are coming to this board to request a contract amendment for the multi-use path on your bueno island. in november this...
SFGTV: San Francisco Government Television
0
0.0
Mar 10, 2025
03/25
by
SFGTV
tv
eye 0
favorite 0
quote 0
>> the 402 acre artificial island was build by engineers from 1936 to 1937 on the neighboring buena islandto build a seawall around an existing sand ball then followed by filling the interior with dredge material from the bay which was consistent of modern sand. the federal government paid for construction ask three permanent buildings which would serve as a potential future airport. treasure island was constructed at the same time as the bay bridge and it was a project of works progress administration to construct this island, which was initially used to host the golden gate international exposition. >> carnival gone big. it was busy. >> it was going to become an airport after the exposition but it was turned over to the navy and turned over to a military base for the next 50 years. >> 1941, the united states army moved to treasure island as america prepared for world war ii. the island was a major training and education center with 4.5 million personnel shipped overseas from triangle. after the war ended in 1945, treasure island was slalthed to be an airport -- slated to be an airport bu
>> the 402 acre artificial island was build by engineers from 1936 to 1937 on the neighboring buena islandto build a seawall around an existing sand ball then followed by filling the interior with dredge material from the bay which was consistent of modern sand. the federal government paid for construction ask three permanent buildings which would serve as a potential future airport. treasure island was constructed at the same time as the bay bridge and it was a project of works progress...
SFGTV: San Francisco Government Television
0
0.0
Mar 1, 2025
03/25
by
SFGTV
tv
eye 0
favorite 0
quote 0
bay trail grant to the multimodal bay skyway a transbay capital project that includes our yerba buena islandti-use path. >> this award comes to the full commission this week and i am excited to be able to vote on it at my first meeting on that body. thank you to my colleagues for appointing me to sit on the mtc. >> we thank mtc for their partnership along with caltrans and other agencies as we seek state and federal funds to round out our budget for the bay skyway which will be incredibly transformative for healthy connections across the bay. >> turning to a top priority for all of us transit operating funding i'm grateful to mta chief deputy executive director alex bachman and s.f. mta director julie kirschbaum for being here today to share the good the new the results of a regional survey regarding a potential multi-county transportation revenue measure to stabilize transit in sfm to phase outlook respectively. >> i look forward to working with you both to support this critical conversation at the regional and local level and also want to express our appreciation and support for the leader
bay trail grant to the multimodal bay skyway a transbay capital project that includes our yerba buena islandti-use path. >> this award comes to the full commission this week and i am excited to be able to vote on it at my first meeting on that body. thank you to my colleagues for appointing me to sit on the mtc. >> we thank mtc for their partnership along with caltrans and other agencies as we seek state and federal funds to round out our budget for the bay skyway which will be...
SFGTV: San Francisco Government Television
0
0.0
Mar 11, 2025
03/25
by
SFGTV
tv
eye 0
favorite 0
quote 0
accepting irrevocable offers of public infrastructure associated with the treasure island and yerba buena island project for the bruton sanitary excuse me sanitary sewer pump station on bruton street and the cravath sanitary sewer pump station on cravath street both on treasure island and the mccullough sanitary sewer pump station on mccullough road and the north gate sanitary sewer pump station on north gate road both on nearby bueno island dedicating this infrastructure to public use, designating it for utility purposes or accepting the public infrastructure for city maintenance and liability. approving a grant deed for the mcallen pump station adopting findings under sequoia, making findings of consistency with the general plan in the eight priority policies of planning code section one and 1.1 and accepting a public works order recommending various actions in regard to the public infrastructure as well as authorizing official acts in connection with the ordinance. >> thank you so much, mr. clerk. we are now joined by a frequent guest of the ladies and chance rotation committee at district si
accepting irrevocable offers of public infrastructure associated with the treasure island and yerba buena island project for the bruton sanitary excuse me sanitary sewer pump station on bruton street and the cravath sanitary sewer pump station on cravath street both on treasure island and the mccullough sanitary sewer pump station on mccullough road and the north gate sanitary sewer pump station on north gate road both on nearby bueno island dedicating this infrastructure to public use,...
SFGTV: San Francisco Government Television
0
0.0
Mar 8, 2025
03/25
by
SFGTV
tv
eye 0
favorite 0
quote 0
and the first is treasure island and yerba buena island. we have been working with tie to the treasure island development authority on a new park operations and maintenance interdepartmental services proposal and an eventual mou. we've discussed funding 15 fte, one manager, seven gardeners, two natural resource specialists, a park section supervisor as well as a plumber, a painter and an arborist tech and so the way that breaks out in year one of this budget title wants us to bring the manager on six months ahead of july 1st, 2026 when a potential transition would take place and then two months ahead for all the other staff. that's roughly $600,000 and then the actual transition the full turnover to our maintenance staff and operations would begin july 1st, 2026 and that's $3.5 million and the source for that is treasurer and the community facility district funding. and then the second agreement that we have been developing is at the hunters point shipyard and this was brought to the commission last year as part of the budget process an moa
and the first is treasure island and yerba buena island. we have been working with tie to the treasure island development authority on a new park operations and maintenance interdepartmental services proposal and an eventual mou. we've discussed funding 15 fte, one manager, seven gardeners, two natural resource specialists, a park section supervisor as well as a plumber, a painter and an arborist tech and so the way that breaks out in year one of this budget title wants us to bring the manager...
SFGTV: San Francisco Government Television
0
0.0
Mar 8, 2025
03/25
by
SFGTV
tv
eye 0
favorite 0
quote 0
and the first is treasure island and yerba buena island. ave been working with tie to the treasure island development authority on a new park operations and maintenance interdepartmental services proposal and an eventual mou. we've discussed funding 15 fte, one manager, seven gardeners, two natural resource specialists, a park section supervisor as well as a plumber, a painter and an arborist tech and so the way that breaks out in year one of this budget title wants us to bring the manager on six months ahead of july 1st, 2026 when a potential transition would take place and then two months ahead for all the other staff. that's roughly $600,000 and then the actual transition the full turnover to our maintenance staff and operations would begin july 1st, 2026 and that's $3.5 million and the source for that is treasurer and the community facility district funding. and then the second agreement that we have been developing is at the hunters point shipyard and this was brought to the commission last year as part of the budget process an moa is b
and the first is treasure island and yerba buena island. ave been working with tie to the treasure island development authority on a new park operations and maintenance interdepartmental services proposal and an eventual mou. we've discussed funding 15 fte, one manager, seven gardeners, two natural resource specialists, a park section supervisor as well as a plumber, a painter and an arborist tech and so the way that breaks out in year one of this budget title wants us to bring the manager on...