the end of january, i got a call from the puc staff member who wanted to get my it is about cutting bulrush at the lake and make access for crew racing and another pier for children's fishing access. two staffers from pc and one from dpw waited for me. we waited for some time for the rpd rep. while we were waiting, we checked the crew racing pier. we develop parameters for cuttingwe went over to see whate could figure out about the fishing pier. the representative never showed up and never called. to the credit of both puc and dpw staff, it it was cleaned up spotlessly and was the first time i had observed cutting at the lake in four years that has happened. the situation with rpd failing to show up gives me an idea of what they're ideas about program development are. there is a green waste dump used to store ship -- to store chipped trees. there are bound the chip would and no barrier of any kind to prevent waste going into the lake. rpd has used the area as a dump for 10 years and hasn't done anything to prevent the mess from sliding into the water. do you think that will change if they s