and in commissions packet, the environmental document after the plan set in the cadex, there's evacuation that goes through the history of the rebuilding. planning did a search of building permit plans for the rear building. there were none available. so we kind of had to go a bit based on what the project sponsor has told us. we looked at aerial photography. the city has quite a good bit of air photos that go back to 2003. it does look like the building footprint has not changed. it's difficult to tell what the roof has been increased much. i did look at the two stories. it's possible that the roof may have been raised a little bit. it's hard to tell. i'm looking at the listing from 2014. it says the listing in the back was a single family dwelling. >> where is this? >> it's on the mls from 2014. the number of units on this property for sale was four. >> it may have been at that time. they have combined the units. i'm not sure. we're only going based on what the project plans of the sponsor are. >> your sense of the size, the footprint and the volume of the building is remaining the same