aggressive in opposing my efforts to have them make the building order to comply with the california energy code, and so, essentially, they turned around and allow the property owner to continue the project, and they never incorporated the requirements of the order, so i have a letter to you, a copy for each commissioner, and attached to it, two attachments. one attachment is the order, and i have highlighted the requirements of the on/off switch, in the second attachment is the documents -- and the second attachment is the document to incorporate the requirements of the order, and it was a backdraft damper. it was nothing that i requested. the essentially omitted everything that i won in that hearing, and i went to great expense. i hired an attorney. i hired an independent mechanical engineer although i am a mechanical engineer myself just to provide the board with an independent qualified opinion. those bands should have never been installed. it was unfortunate that the compromise was even accepted by the board. i was hoping to address the merits of my case and get into the technical issue of