there's caltrain refarsz and walk first and the water project and the sewer project going on this is a big deal and trying to coordinate the construction on the community. there's a dpep will get money back from the from federal government so we're going reallocating it so from chris from our cac this is not part of the plan 1952 work that needs to be done immediately to prevent erosion and last but not least is the category that includes some specific funding for the projects coming out of the study i'll appoint us u out last month the committee talked about the schlage lock project to provide direct cease to the caltrain station through the development there the sequa benefits now as well as the people from the rehab with that, i'm going to turn it over to this will be more ground level provision for the categories >> thank you maria thank you deputy for policy and programming so this guide demonstrates the first vision zero oriented educate with the pedestrian safety and the circulation category. there's 3 signal categories in prop k. and those are 20 to install signals and signs