the carlsbad project in san diego has been approved, but has not been built. i think there is only one facility in the united states, in florida, which was hampered by cost overruns and was four years late. that is the example in this country. thank you very much. >> good afternoon, commissioners. my name is eric brooks. i am with grass-roots group our city, and the chair for the san francisco green party. i will reiterate what i have said before. just as building fossil fuel power plants is an aggressive industrial greenhouse gas producing and expensive method of dealing with its effects, like water impact, building an expensive high energy use desalinization plant represents the same approach. we are building a major industrial facility that belongs in the 20th century when we should be using local approaches to localize our water savings and water supply to our communities, doing things like installing permeable pavement, putting in bio soils, water collection, and gray water piping all over the city. we are talking about things that would create hundreds a