the cmg contract rs -- i would d she will represent the folsom design followed by carrie ru rudneck and she is the project manager for the folsom project. >> good afternoon carrie with cmg landscape architecture. i am patiently awaiting the slides. >> welcome. >> thank you. i am briefly going to try to move through the project design as quickly as possible. we have been working with ocia and public works on the design. as shane mentioned the scope is from second to spear street, about six block area. when we started the project our charge was to implement the 2006 approved open face plan for the transbay area along folsom street. we saw the main project goals as creating vibrant main street linking the rin con and transbay neighborhood and providing services for all the new residents. the second piece we saw was implementing green infrastructure. that meant re-establishing transit from folsom to existing and new residents in the area and also providing a two-way bike lane, a dedicated bike lane eastbound and westbound and then the third layer of that is providing wideth sidewalk for ped