the 427 mw ccgt unit was put into operation.eam-gas plant, built together by our chinese comrades. our lukomorsk station is like it worked, it still works, but it was a separate project that added to the increased capacity of the aal station. there is a slightly different principle of electricity generation here. gas that is supplied separately from another hydraulic fracturing unit. comes to us here at the pgo, through live compressors, its pressure increases, and it is already supplied to the gas turbine, where this gas is directly burned, due to the combustion pressure the gas turbines rotate, the heart of lukumalskaya gres is the central control panel, the central panel - this is the main brain of control of everything station, all the information that... happens, sometimes even flies out, one might call it that, flows here, and to workplaces to eliminate some defects that affect the safety of the operation of the power equipment itself. we introduce you to the architectural memories of belarus, different eras and styles. by