this action constitutes the approval action for the project for the purposes of ceqa, pursuant to sanfternoon, commissioners. >> i'm shelby the prosecuting force campus on 200 marin and here to request your properties for the negative declaration and approve this project to plead for those of you who don't know who the city distributionhe san department that is what you see on the tracks city for people maintaining the cities and counties decide water system our 12 hundred miles of in the meta program why are we can÷é those faciliti? little existing facilities for the construction in the 60s exceeded the useful san francisco had population growth resulting and as you can see is from the we're fabricating this mask war for theable nothing sufficient to maintain the vehicles we have overcrowd offices to current existing campuses wasin and cross traffic at the campus we're going to solve all those o marin and in good company with the puc west of chavez and on the yards on the other see a closures look bounds by■ chavez and west 200 marin dead i understand on the south side and way to the
this action constitutes the approval action for the project for the purposes of ceqa, pursuant to sanfternoon, commissioners. >> i'm shelby the prosecuting force campus on 200 marin and here to request your properties for the negative declaration and approve this project to plead for those of you who don't know who the city distributionhe san department that is what you see on the tracks city for people maintaining the cities and counties decide water system our 12 hundred miles of in the...
SFGTV: San Francisco Government Television
16
16
Aug 25, 2024
08/24
by
SFGTV
tv
eye 16
favorite 0
quote 0
part of ceqa this is less thans is a new exemption brand new exemption not aroundlong.ct i believe our project was probably in the first 10 projects brought exemption so the way it is me i'm not a ceqa experts tell what they call the they required n program something less than an adopt and req m m rp it is different. what we've done and theprurmd to be preliminaries after ceqa were completedese exemption was approved and really those both the m rp the protective measures trying to requirements and then build in whatever superstars we want in there for a completes program. noty ceqa to put together and adopt byies rather was somethingf having requirements we had that from beginning. >> we - shouldn't have called is confusing to call that an m multiple voices.) >> a specific thing. >> one question i h this i'm assuming i have so somehow we need to this data we can track we're doing all those but for clarification for one second i th i got. >> okay. thank you for that. >> we're required to ultiple voices.) >> and you're not required- >> (multiple voices). >> because we wan
part of ceqa this is less thans is a new exemption brand new exemption not aroundlong.ct i believe our project was probably in the first 10 projects brought exemption so the way it is me i'm not a ceqa experts tell what they call the they required n program something less than an adopt and req m m rp it is different. what we've done and theprurmd to be preliminaries after ceqa were completedese exemption was approved and really those both the m rp the protective measures trying to requirements...
SFGTV: San Francisco Government Television
20
20
Aug 23, 2024
08/24
by
SFGTV
tv
eye 20
favorite 0
quote 0
in place and staff put together the ceqa op and is monitoring protocol called itge m m rp rather thanection mandatory and it is confusing not need to be adopted pid the permanentny and in the ceqa adoption implementing agency not thed agency the led agency is stan law cie so assumed as stated in the revised version assumed responsibilities for implementing the monitoring requirement associated wh the permit and the protection measureme i into the mitigation reporting plan we have. for this project. that. >> you're answering questions which is we pulled it off consent agenda maybe aer that asked question can comment on the. >> commissioner stacy. >> thank you for is presentation he did have■,hat question head h o time and that the program is a normal clash to everyone but paurlz a see measures are built in into the project so looks like a thorough review and i also um, wanted to thank you. the nonprofits and agencies there were a number of um, organizations involved they there is a motion on the table. working on this program is trusts and the tallying me river anis. >> (pig sound.) >>
in place and staff put together the ceqa op and is monitoring protocol called itge m m rp rather thanection mandatory and it is confusing not need to be adopted pid the permanentny and in the ceqa adoption implementing agency not thed agency the led agency is stan law cie so assumed as stated in the revised version assumed responsibilities for implementing the monitoring requirement associated wh the permit and the protection measureme i into the mitigation reporting plan we have. for this...
SFGTV: San Francisco Government Television
28
28
Aug 18, 2024
08/24
by
SFGTV
tv
eye 28
favorite 0
quote 0
adopt the final mitigated negative decm pursuant to the california environmental quality act (ceqa);project no.10037249, city distribution division (cdd) enue; and authorize staff to proceed with actions necessary to implement the to implement the to implement the project d7 including issuance of the notice-to-proceed for the construction phase pursuant to the construction manager/general contractor (cm/gc) contract no. wd-2879r. this action conspr action for the project for the purposes of ceqa, pursuant to san francisco administrative code section 31.04(h). >> slides please. commissioners. >> i'm shelby the force campus on 200 marin and here to request your properties for the- negative declaration and approve this project for those of you who don't know who the city distribution city they're the what you see on the tracks around the for people maintaining the cities and co water system our 12 hundred miles of pipelines meta program why are we can those fac existing facilities for the construction in 60s exceeded the useful life and growth resulting in overcrowded and as you can se
adopt the final mitigated negative decm pursuant to the california environmental quality act (ceqa);project no.10037249, city distribution division (cdd) enue; and authorize staff to proceed with actions necessary to implement the to implement the to implement the project d7 including issuance of the notice-to-proceed for the construction phase pursuant to the construction manager/general contractor (cm/gc) contract no. wd-2879r. this action conspr action for the project for the purposes of...
SFGTV: San Francisco Government Television
15
15
Aug 27, 2024
08/24
by
SFGTV
tv
eye 15
favorite 0
quote 0
need those part of ceqa this is less than this is exemption brand new exemption not around long.bly in the first 10 projects brought into the new exeon so the way it is explained to me tell what they call the u can exemption. they required protection less than an adopt and required adoption like an m rp it is different. and so wha we've done and the consultant we exemption was approved and really those both the m m rp the protective measures trying to anticipate all those then build in whatever superstars we want to pit inre for a completes program. not something that of required by c and adopt by the led agencies er we were doing in anticipatin having requirements we had that from the beginning. w have called is that. >> it is confusing to m m rp. >> (multiple voices.) >> a scithing. >> one question i had i was doing this assuming i have collected a lot of data. somehow we need to make sure that alls data we can track how things are evolving as we're doing all those things but for thought you said - i got. >> okay. >> thank you that. >> we're required to monitoring. >> (multiple
need those part of ceqa this is less than this is exemption brand new exemption not around long.bly in the first 10 projects brought into the new exeon so the way it is explained to me tell what they call the u can exemption. they required protection less than an adopt and required adoption like an m rp it is different. and so wha we've done and the consultant we exemption was approved and really those both the m m rp the protective measures trying to anticipate all those then build in whatever...
SFGTV: San Francisco Government Television
23
23
Aug 16, 2024
08/24
by
SFGTV
tv
eye 23
favorite 0
quote 0
of our meeting minutes from all hood working group meetings, as well as all the documents again to ceqaand entitlements are all there.we also proactively go out to in fact, we will be doing more this fall and always making sure that we give people in the public an rtunity to share if there are things they have questions about x or concerns about, that we address those either person or on the website in some way. >> for majority of the neighborhoods they have are there letters from these associiog or not approving or giving input feedback or just minutes of the meeting? >> many letters were submitted in entitlements and environmental review, but also we ie earlier this spring and received letters of of the community, friends of frag others, so yes, absolutely. >> thank you. my last question is, there were fourthe past five years. should we anticipate up soon or next year? how do you the project and do you think there will be a need for more modification for this? >> this should be the we will be moving into the project next year and so there will be a separate agreement withfor advisory
of our meeting minutes from all hood working group meetings, as well as all the documents again to ceqaand entitlements are all there.we also proactively go out to in fact, we will be doing more this fall and always making sure that we give people in the public an rtunity to share if there are things they have questions about xor concerns about, that we address those either person or on the website in some way. >> for majority of the neighborhoods they have are there letters from these...
SFGTV: San Francisco Government Television
13
13
Aug 28, 2024
08/24
by
SFGTV
tv
eye 13
favorite 0
quote 0
the others if we took it down we a 3 month ceqa process and so by keeping ita voluntary structura categorical exemption, so that is paare able to speed up the schedule. the other op that are critical to g at the same time. that is psych cafeteria that is connected to the new building but not in the new supplies food, the pharmacy and then-joe, what is the other function? so, they all support each other even though they are two structur the new building we built and finished in the older building we are renovatingism there is bridge that connects them and if you haven't been out there it is the flow of the physicians and nurses anand radiology and everything else that has to take , so the decision was to keep it, because wen't have any real estate available at this point on the acre campus, especially after the ilding was built on that parking lot. we have very little space were to take it down, build new, we have do temporary pharmacy, temporary facilities that would just go away when building was built so we are throwing away so we made a decision to keep it. on so many fronts so that is a e
the others if we took it down we a 3 month ceqa process and so by keeping ita voluntary structura categorical exemption, so that is paare able to speed up the schedule. the other op that are critical to g at the same time. that is psych cafeteria that is connected to the new building but not in the new supplies food, the pharmacy and then-joe, what is the other function? so, they all support each other even though they are two structur the new building we built and finished in the older...
SFGTV: San Francisco Government Television
12
12
Aug 25, 2024
08/24
by
SFGTV
tv
eye 12
favorite 0
quote 0
if we take federal money has to go through ceqa an to be cleaned up and will be expensive.garden or retail is feasible. the mean time, the state of california seeing the problem throughout the ste ent has made a pot of money available for like this one to transition a bio fuel station on the west side of town, so it is a we have and you know, this gives us a opportunity to . so, what is before you today 20years as the clerk said, grant from the state to transition into bio requirement of the lease. in addition to that, the end of the lease which is the e doesn't, so i do think that hathis tires on --i have explored all i do-we are bringing in front of you today,is a good option. my fear is this, we have heard from some ofenvironmental groups who rather have this be then have a sale of i have the experience of side of the juvenile justice center that is empt now that has been plagued withfires, graffiti, garbage, and this site right the boarder of d8 and d7 is one of the most visible spots it is what every tourist bus s up twin peaks and i do not want to have we leave behind. that is also n
if we take federal money has to go through ceqa an to be cleaned up and will be expensive.garden or retail is feasible. the mean time, the state of california seeing the problem throughout the ste ent has made a pot of money available for like this one to transition a bio fuel station on the west side of town, so it is a we have and you know, this gives us a opportunity to . so, what is before you today 20years as the clerk said, grant from the state to transition into bio requirement of the...
SFGTV: San Francisco Government Television
11
11
Aug 27, 2024
08/24
by
SFGTV
tv
eye 11
favorite 0
quote 0
the others if we took it down we would have about month ceqa process and so by keeping it there structurhat is paperwork and we ar speed up the schedule. the other operational issues that are critical to keep four things futioning at the same time. that is psych emergency service, the cafeteria that is connected to the new building but not in the new buildingz0 that supplies food, the pharmacy and then-joe, what is the other function? so, they all support each other even though they are two structures. the new building we built and finished in 2015 and the older building we are renovatingism there is bridge that connects them and if you haven't been out there it is insightful to rouggoand see the flow of the physicians and nurses and lab work and radiology and everything else that has to take place betw buildings, so the decision was to keep it, because we any real estate available at this point on the ac campus, especially after the ilding ansactional research was built on that parking lot. we have very little space to do anythingsowere to take it down, build new, we have to do temporar
the others if we took it down we would have about month ceqa process and so by keeping it there structurhat is paperwork and we ar speed up the schedule. the other operational issues that are critical to keep four things futioning at the same time. that is psych emergency service, the cafeteria that is connected to the new building but not in the new buildingz0 that supplies food, the pharmacy and then-joe, what is the other function? so, they all support each other even though they are two...
SFGTV: San Francisco Government Television
14
14
Aug 23, 2024
08/24
by
SFGTV
tv
eye 14
favorite 0
quote 0
me minutes from all the neighborhood working group meetings, as well as all the dos ain related to ceqaents are all there. in addition, we also proactively go out to events throughout the year. in fbe doing more this fall and always making sure that in the public an opportunity to share if there are things they have questions about or concerns about, that we address those either there in person or on the ite some way. >> for example, every neighborhood--majority of the neighborhoods they have neighborhood associations. are there letters from these associations approving or not approving or giving input and feedback or just minutes of the meeting? >> many tte were submitted in support of entitlements and eniew,vinmbut also we applied for grant funding earlier this spring and received er support for that application from friends of franklin square being one example among others, so yes, absolutely. >> thank you. my last question iswere four modifications in the past five years. should we anticipate one coming up soon or next year? how do you see the project and do k thyoe will be a need f
me minutes from all the neighborhood working group meetings, as well as all the dos ain related to ceqaents are all there. in addition, we also proactively go out to events throughout the year. in fbe doing more this fall and always making sure that in the public an opportunity to share if there are things they have questions about or concerns about, that we address those either there in person or on the ite some way. >> for example, every neighborhood--majority of the neighborhoods they...
SFGTV: San Francisco Government Television
23
23
Aug 17, 2024
08/24
by
SFGTV
tv
eye 23
favorite 0
quote 0
we've received ceqa plan approved and we are now in i mentioned earlier, we have, the hilton hotel, that a bridge that connects our park and the hilton. we areon removing that and getting their needed appr be on the opposite side, when so as i noted, we are hopeful that everything we can release our bid docs later this fall for construction start in after lunar new year next year. south sunset clubhouse is about to go into advertisement and we will start our interior, improvements and some exters is a high level overview of our , and i just want to end with our cityws. we have a lot of them. i'm going to draw your trails. we are working on a partnersh to add nature exploration areas. we have four spaces identified. tenderloin rec, the crockernd at crocker, amazon, silver terrace and randolph bright. all will get an infusion of nature and then on the right, with peaks, we are in the middle of construction o excited. we think this this general obligation[s really helping us to continue reshaping our parkland and making sure everything is welcoming and these are our, i always first. this is
we've received ceqa plan approved and we are now in i mentioned earlier, we have, the hilton hotel, that a bridge that connects our park and the hilton. we areon removing that and getting their needed appr be on the opposite side, when so as i noted, we are hopeful that everything we can release our bid docs later this fall for construction start in after lunar new year next year. south sunset clubhouse is about to go into advertisement and we will start our interior, improvements and some...
SFGTV: San Francisco Government Television
9
9.0
Aug 28, 2024
08/24
by
SFGTV
tv
eye 9
favorite 0
quote 0
we've received ceqa clearance conceptn approved, and we are now in design portsmouth square.oned earlier, we have, a neighbor, the hilton hotel, that has a bridge that connects thee working with them on removing that and getting their needed approvals for what willsite b se bridge is removed. so as i noted, we are hopeful that everything is moving forward there and that we can release our bid docs later this fall for construction start in afr year h sunset clubhouse this is about to go into advertisement and we will start our interior, improvements and se exterior improvements as well. this is a high level overview of our project schedules, and i just want to end with our citywide lot of them. i'm going to draw your attention to the bottom two playgrounds and trails. we are working on a partnership with kaboom to add nature exploration area four spaces identified.c, t crocker purple playground at crocker, amazon, silver , and randolph bright. all four of those parks will of nature and new play elements, and then on the right, with trails as twin peaks, we are in the middle of
we've received ceqa clearance conceptn approved, and we are now in design portsmouth square.oned earlier, we have, a neighbor, the hilton hotel, that has a bridge that connects thee working with them on removing that and getting their needed approvals for what willsite b se bridge is removed. so as i noted, we are hopeful that everything is moving forward there and that we can release our bid docs later this fall for construction start in afr year h sunset clubhouse this is about to go into...
SFGTV: San Francisco Government Television
16
16
Aug 20, 2024
08/24
by
SFGTV
tv
eye 16
favorite 0
quote 0
we've received ceqa clearance concept plan approved and we are now in design portsmouth square. neighbor, the hilton hotel, has a bridge that connects our park and the hilton. we are working with them on removing that approvals for what will be on the opposite side, when the bridge is removed. so as i noted, we is moving forward there and that we can release fall for construction start in after lunar new year next year to go into advertisement and we will start our interior, improvements and some exterior improvements as well. this is a our project schedules, and i just want to end with our citywide parks and programs. we have a lot of them. i'm going to draw your attention to the bottom two playgrounds and trails. we a<