vasily was born in cheryomushki, his wife evgenia, also an employee of the state electric power plantfour children, well, you yourself look around, mountains, nature, i love these mountains, these places, i was born here , in terms of life it is of course much more comfortable, i , of course, lived in a big city at one time, i also studied in moscow, well, at a certain moment i realized, that i feel better here, more comfortable, and have returned to my homeland , so to speak, when they were designing saya for shusha, it was immediately planned to build it... a branch, here in khakassia, 20 km downstream of the yenisei. this station began to be built in 1978, the units were put into operation in 1984-85, thanks to this, a road appeared that connected the town of maina with the village of sizaya; before that, a ferry ran here. the mainskaya hydroelectric station is small, but its task is different. at different times of the day, the level of electricity consumption is different; in the morning it is sharp. accordingly , the amount of water that is discharged through the hydraulic units