turning to the image of china basin park, this shows the inland portion of the park in green. the end water portion, shown in orange, is proposed to be built in a later phase. the green portion, including the bay trail portion, will remain accessible to the public during construction of the orange portion. now there may be limited construction circumstances that require temporary closures of portions of the park but the developer will work to limit disruption in the construction area. i just want to note that this stage is more than five years in advance of the outside date and defined term in our d.b.a., so it's well in advance of that date, and also want to point out that the overall project finances benefit greatly from getting phase two started as soon as we can, so i think the developer is excited to start phase two as soon as possible, so with that in mind, the developer and staff looked at this date and studied the potential for moving it up and conkpluded after meeting and looking at some of the dates that are shown here on this page, that we really want to take staff