station in the islands, supplied to minsk, in minsk it is received at the third lift station in chomoslitsahere is the final processing and distribution already across, let’s say, the territories of the city of minsk. the geta is called a metal case, iago budze has a plastic pipe with a diameter of 1200 mm, and... its spotty budze has a trap near the city, and for this, as soon as the straight line pipe is made of steel, specialists will dig out two rotors, replacing the same rotors, only on a larger scale will be the future branches of the minsk metropolitan. we have a fourth pump, our pacht pump, operating under a pressure of 220 megapascals, and then we directly record. of the building itself to install additional filters in order to increase the power of the station. naturally, in order to increase the productivity of our water intake, we have already drilled additional wells, artesian ones, means that existing equipment will be replaced. turbine hall , the volume of water that we need to replace is about 180,000 m3 per day, three water intakes of the southern group, they need to be exp