90 new wells of varying depths have been drilled, from which water will flow to the facility in chumyslitsa. undergo a complex purification process to be supplied to the city. about 100-120 km of total water pipelines, which stretches from the chervensky water intake district, the southern group of the derzhinsky district, partly there several wells in the uzdinsky district and the minsk region collect common water, supply it to the islands, water intake, and from the island it already comes here to minsk at the slitsa station. this system. the opportunity to connect the remaining two districts to carthusian water: moskovsky and frundinsky. the large-scale construction is planned to be completed by the end of 2024. the minsk zoo will switch to winter operating hours from november 1. preparations for it began back in september. all enclosures are insulated, disinfected and, if necessary , repairs are made. the first to switch to autumn-winter period, heat-loving animals have become. primates, lemuri and pink flamingos. in winter they will live in glassed enclosures, so they can be easily hou