over clementina and down on n. of howard st. in the upper right-hand picture, the bus ramp shows with evan and ms. ewald that's been installed between harrison and fulsome. basically, between the to bridge structures there and then the bottom right shows right before the--there's some pours and that is the turnaround area that's over clementina is where the guard shack and turnaround will why not get a lot of work is happened there, both of the frame for decks reported last month as well. lot of good progress as the bus rams starts coming together. central zone for upcoming activities, really completing the w1 awning. that can happen very soon. continue with electrical room buildout which is important there inside the demolition the first-rate temporary bridge which is going to happen in the next month. eastern zone, continue get that last bit of last deck poor. get the rooftop concrete for the walls and penthouse decks. that's the additional buildings that are structures on top of the roof will be poured and then continuing the