in 2020, criagen supplied the indian space agency with major equipment for two rocket engine test bedsch cargo can take up to several years to reach the addressee from the moment the contract is concluded. this line was sent from balashikha to the river port of the moscow river in order to along the water canal she arrived at the seaport of st. petersburg and from there through the suetsky canal to the southern coast of india. in total , this journey took 108 days until installation on the foundations; it is necessary for testing the main equipment before an important event, the launch of a space rocket. there are two main routes through the port. the first through the european ports of antwerp and rotterdam to moscow and st. petersburg, the second through the black sea. due to western sanctions against russia, we can use not only these routes, there is an eastern route, it is called the international north-south corridor, which runs to russia through iran, that is, from our port the cargo arrives at the iranian port of chabahar. from there, containers are delivered by rail across the