d.r. requestor? project sponsor? >> story poles were installed on october 25, which was within the 30-day period. they asked for some changes, some setbacks, and to show additional 42-inch walls and guardrails. it was updated on november 10. on october 31, they were sent drawings to show that the changes were made. so by october 31, had a set of drawings. by november 10, they had -- the story poles were corrected. on november 15 and december 9, they were sent emails stating that the story poles were corrected. and the project was adapted to their request. in particular, 42-inch wall on the west side. staircase was added. 42-inch wall, deck, on the second floor was added. a three-foot cutback on the northeast corner was shown. so it did clear the window. additionally, we took off a stairwell on the roof. we cut back the northeast corner, we clawed back the northwest corner. we also set back the third floor three feet back from the property line. and additionally per the design committee's request, set back the deck fi