it would move 97% of the water from the danube river through a concrete channel that could then be runhrough the turbines. hungarian scientists began to realize that there would be vast environmental consequences-- pollution of groundwater tables, even surface water would be polluted. it could potentially destroy habitat for animals. and there was another issue that downriver from the dam is budapest, a city of 2 1/2 million people. in time, hunrians, through street protests, et cetera pressured their own government to slow down on their... their half of the project, so that by late 1980s, the hungarians only had completed roughly ten percent of their project, where the slovaks had pushed ahead, actually, and were almost 90% done. so this started to cate tensions between the two countries. with the hungarians not wanting it to go through and... and stopping, the slovaks came up with an option to just completely finish the dam and the whole project on their side of the boundary. kulesza ( translated ): it has produced a tangled web of unresolved ecological, political and legal problems