everything promises to be in time by august daria yuryeva in more detail.s no rain here, there are no sidewalks and completely broken road. first industrial does not meet the standard. but soon all this will be in the past. now they are laying the sidewalk here. bike lanes coming soon. but as soon as the water and mud begin to lay the road for repairs , almost a kilometer of the roadbed will fall into the section where more cargo and special equipment travel every day, so the recycling method will be applied here. this includes milling. uh, then mixing with crushed stone additionally strengthens the base added adding cement, then special equipment that lays out the slab and , accordingly, makes it all much stronger new. it will last more than 5 years , not only heavy cars destroyed it, but also water during the rains, the street turned into a canal today. we have already laid a main storm water line here, which will cut into kulakov avenue, storm water lines will also be added on makarova lane . in addition, curbs will be replaced here, sidewalks will be up