red line in the center of the platform there will be a sculpture by the famous russian artist dashinandakov, which also combines engineering functions, namely the supply of warm air engineering infrastructure is being developed on the platform for passenger comfort. this is the construction of a new gas pipeline along the kiev highway, the length is 25 km, this high-pressure gas pipeline is 12 kg. build connects to it, lowering station, which with reduced pressure goes to the end user. by 2031, the plan to build 400 km of such main gas pipelines in new moscow takes into account the development of territories over 100 km over the next 30 years. from this volume, and that's what we see today, the blue- green lines are built. it has already been put into operation. that is, all the available sites for urban development, which today are fixed in various government programs. they are reflected here. and they are accordingly covered included in this system of electricity supply and sanitation. this complex of treatment facilities is only 40% loaded. now sewage and sewage waters from several villa