with their engineer, dave cane, who knows a lot about this, they came up with a fix. the two engineers worked together and came up with a fix. we just said we're going to fix it. we didn't stop any of that. we said we were ready to go. i mean, he was -- our contractor was ready to do it. he said one week, he'll be done. then it went sways. i don't know how. i left shaking hands, exchanging phone numbers, everything, and even to today, just walking in the door, they were saying hi. now, we want to make it right but when they came, and they switched around the price, and they were saying -- we were in mr. duffy's office with another gentleman, another senior inspector, and they offered to put a senior inspector on the job to look at it, we told them our contractor will do the work. we'll watch it. we'll take care of it and everything, and they said no. and they came up with a crazy price -- i mean, our contractor does a lot of work for us. a lot of work for us. we were going to fix it. just like my daughter hit someone. backed it -- little damage to the car. i offered h