so the complaint was filed with dbi on the 1st of november, 2017. and on the 2nd of november, we issued a notice of violation. and the notice of violation read, complaint has been filed with this department regarding a structure built on top of the roof. a site inspection revealed third storey addition. this exceeds the scope of the permit. no access was provided. work was visible from the street. approximate size of addition is 1600 square feet. permit with plans and planning department approval, provide full scope of work at time of filing, separate plumbing and electrical permits are required. and it was assessed a penalty. so it looks like the building inspector did view it from the street and had limited access, but did want to get it on notice. and in addition to the appellant and the lawyer's concerns, they could file a new complaint -- if the permit was upheld and the appeal rejected. the dbi could take a complaint on it to make sure what they have up there is what is in the plans, including the use and size and what they're going to do. the