enhancement for the sake of fire fighter functionality so new work shop and gear drawing room, deacon tamination shower squz updated telecommuneitation and it support. the budget is approximately 10.7 million dollars. a few images here. hopefully you have the hard copy, it probably reads better than this image. we are growing the facility by 10 percent in square footage all the purpose of bringing it to the modern era with all the proper array of spaces and size spaces so we can support the fire person elinto had next 2 generations. these drawings here-we show before and after. the smaller imsubject the current station, the larger image is the proposed and approved design by civic design review. this elevation on the slide are the front of the building on grinch. this next slide are images of the rear of the building on pixly. as i mentioned, pursuant taa question asked by supervisor yee there have been a number of external meetings and as i mentioned 19 by our count, 6 among commerce and neighborhood groups which are described on the foot note of this particular side, 4 groups ibparticular. we