remove the bracing and start to form the vertical walls and columns and that has started to level, debracing, has started the removal on october 28th and we are in the middle of the third section. and the wall forming is started and the next 30 days. and expected to complete the excavation in zone four down to level cand the third level, and started to level four. and bracing, and that will not company pleat in november but it will complete in the next 60 days. >> and that will be completed in the next 30 days. by next period we should be reporting how many walls will be poured. >> and we will be installing the water proofing and in the mud slabs this period and we started the casting, and kansas and louisiana right now is doing our future steel structure and that is ongoing. we will continue for the next period on mission street. and down by main and working our way towards first street and we will remobilize the micropile contractor. in 60 days we should have all of the bracing in zone four through the final level d. and the demolition should be complete. and which is the final level. and