decosta said, it's not an ideal location for a dam, but that is the only location available. obviously, the original dam was built in the ideal best location. downstream of where we're building this new dam, there is a known, very significant landslide. there was no question that we could site our new dam over there. so in order to be able to keep these water rights that we have at calaveras, there was one place where we could really locate that dam, and that is where it is. and you are 500' way from the calaveras dam. obviously the dam is designed to withstand the ground shaking from that fault, but nonetheless, we need to build in some very complex geological conditions. >> commissioner torres. >> if the dam god forbid would collapse. >> the existing one? >> the existing one or new one, would the city of fremont be flooded? we were talking about that earlier. >> do you know the answer to that? it depends i guess how you define "flooding." to what extent? >> good afternoon commissioners, dan wade, senior project manager for the projects that includes calaveras dam. in answer