deerline. i'm not trying to play gotcha, but the a.b.b. paperwork that they submitted and the analysis that they did was on the other side of the building and on the d stacks, and i'm wondering why that is the data that is being relied on for the b-stack on the opposite side of the building. am i making any sense to you, gregory? does that make any sense? >> yeah. the latest report that i looked at is the cracked window report, the a.b.b., and this is the report that they filed in the last month or so, right, the last few weeks, which everything on that was on the cracked window, so that's what i've focused -- >> i have not looked at that for a couple of weeks, but my recollection was appended to that was information that they garnered from their investigation from a number of units, and they found, if my recollection serves me, that the curtain was performing well in the e and d stacks of the building, on the south side of the building, whereas these are on the mission side of the building. i believe that information was repeated in the a