therefore, the shortage of power and utilization here is greater than in other federal districts; denis butsaevforum that this problem needs to be solved. in the far east , we have signed a road map with all eleven regions, but the implementation of these road maps, unfortunately, is not equal. we discussed this today at a session held at the forum. uh, the status of, for example, uh sakhalin, the status of yakutia, uh, quite active work is being done there, we see in this regard that colleagues are even with some advances uh implement plans for infrastructure construction. and, for example, in sakhalin we have three facilities that will be built in 2026. we will be able to meet the targets of 2030 in the sokolinsk region already at the design stage of three modern waste sorting complexes. there, in three years, the northern cluster, the southern one, and the so-called central one will be built in the southern one, the largest facilities amounting to 150,000, which is about 200 e, 210 thousand tons of waste generated in the region, respectively. between these three clusters these volumes will b