they will work as quickly as possible, he promises head of the government denys shmigal.listen to the direct speech. the power system is intact and... works stably, power engineers control the situation, but the generation of electricity is not enough, or to cover all consumption, so ukrenergo is forced to return to blackout schedules. both for the industry and for the population, well, indeed, reconstruction takes time, and we have already experienced the schedules ourselves, and i think that ukrainians should be tolerant of these schedules, because there is a lot of dissatisfaction in social networks, why not warn why there are no such clear schedules, because, dear viewers, these are emergency shutdowns, ukrenergo explains, the company yasno, which provides us with services, explains, everything depends on how much available, available, available current in the network, whether they have time we will order some additional power from our partners from the european union, and the plus right there is the generation that was, say, if we are talking about the kanivska test,