that's why we chose to use dermalogica. we got permission from the residents and from our neighboring businesses and also we sublet from the bank of the west. when i went into the department to renew it, i stated i was renewing the permit, i finally had the money for the sign. they said we don't care, i told them i was changing it to dermalogica, showed them the plans. the words were we don't care what it is, as long as it's in the frame, not stating any sizes. the sign was going to be cheaper because it was going from two colors to one color. the first time the inspector came out, he had the plans in front of him. the installer wasn't finished so they said everything looks good but now you have to submit paperwork. the installer didn't submit the paperwork. the inspector came out, approved the signs. we had some things sent back in. they came back out, signed off on everything in the building department. we were finally good to go. the moment that sign went up, it triggered us to be formula retail. we had no idea the sign