SFGTV: San Francisco Government Television
65
65
May 29, 2016
05/16
by
SFGTV
tv
eye 65
favorite 0
quote 1
i'm greg he live on according con go a block from our redwood tree the process that is followed by dpw and the sponsor lacks transparency fairness and common sense in any limit time i'll try to raise two points it appears the urban forestry council has been shut out of the process this is the document that shows section for public works code and shows the duties of urban forestry to make the recommendations to the director on appeals of applications for tree removal and then this from the environmental code the scope of the authority the urban forestry council subsection 3 it shall consider the issues that retails to trees on private property the urban forestry council has not been sought in contradiction and contradictory to the entire purpose of the urban forest council and moving to a different point i find harsh and hate to see that happening the decision to approve the application seems to have been made before the application was submitted to a non-public input before it was made and removing the hand of transparency i hope you see are a couple of e-mails and friday, october 30th
i'm greg he live on according con go a block from our redwood tree the process that is followed by dpw and the sponsor lacks transparency fairness and common sense in any limit time i'll try to raise two points it appears the urban forestry council has been shut out of the process this is the document that shows section for public works code and shows the duties of urban forestry to make the recommendations to the director on appeals of applications for tree removal and then this from the...
SFGTV: San Francisco Government Television
80
80
May 7, 2016
05/16
by
SFGTV
tv
eye 80
favorite 0
quote 0
do you know what the standard is that the dpw is for access to streets 82 garage?ecklist? do they go out and model? >> commissioner zepp: i'm not required on the family video dpw requested i would assume that the code that guides what grades can be when access would be and so the sponsor would have to follow the public works code >> commissioner richards: my only concern is the street for some reason can be put a car up there. you don't build a garage that we give you direction that usually it something else or you, dated some other design that having a garage does not is kind of stupid. i support the project with that intense. but you don't build the project can't use it. that's determined by dpw. >> president fong: commissioner mar >> coucilmember loar: we need to remember that the street itself-this is not somebody asking for an extension of subdivision which does not already exist. if that was the case it would most more scrutiny would be required but that's not the case here. so the fact is that the street is not built is not the first time that we are approvi
do you know what the standard is that the dpw is for access to streets 82 garage?ecklist? do they go out and model? >> commissioner zepp: i'm not required on the family video dpw requested i would assume that the code that guides what grades can be when access would be and so the sponsor would have to follow the public works code >> commissioner richards: my only concern is the street for some reason can be put a car up there. you don't build a garage that we give you direction that...
SFGTV: San Francisco Government Television
37
37
May 20, 2016
05/16
by
SFGTV
tv
eye 37
favorite 0
quote 0
close this out i on intersections we left off talking about the difference and the other thing from dpw is paying the in lui fee which is 18 per tree i heard a total of 5541 we can do a check for that you know, i on intersections that chris agrees the site looks at great the trees as we see the projector we had brought up our landscaper architect says that within 5 years a 36 inch box tree will fill out what a 60 inch box they trithis is in 5 years a 60 box tree would have been we're looking to the board to close it this out we're in line with dpw and ada and fta this site looks at good we're looking to close out at the direction of board tonight thank you. >> thank you thank you. >> your number is different than the d s he said 5 at 21 hundred. >> that was the delta so i think the confusing thing with the board is trying to follow kind of a rule book book with the city an in lui fee which is 1890 and the delta of planting a 36 inch tree and a 60 inch my understanding the 36 tree is 29 hundred to plant and a 60 is 5 thousand that is the delta of 10 thousand 5 hundred we were supposed to
close this out i on intersections we left off talking about the difference and the other thing from dpw is paying the in lui fee which is 18 per tree i heard a total of 5541 we can do a check for that you know, i on intersections that chris agrees the site looks at great the trees as we see the projector we had brought up our landscaper architect says that within 5 years a 36 inch box tree will fill out what a 60 inch box they trithis is in 5 years a 60 box tree would have been we're looking to...
SFGTV: San Francisco Government Television
25
25
May 29, 2016
05/16
by
SFGTV
quote
eye 25
favorite 0
quote 1
immediate almost eco implies that mohammed nuru if dpw calls it we come in and try to fix things whether or not broken signs or faded out crosswalks or damaged things on the streets that don't work or anything that might make residents visitors, merchants and others feel unsafe in their neighborhoods needs to be fixed the assembly will be better coordinate under if program i've directed all the parks including the rec and park department and departments we nominated working together to make sure that we fix that's why the fix it teams are announced under the directorship of sandra a very veteran, if you will,
immediate almost eco implies that mohammed nuru if dpw calls it we come in and try to fix things whether or not broken signs or faded out crosswalks or damaged things on the streets that don't work or anything that might make residents visitors, merchants and others feel unsafe in their neighborhoods needs to be fixed the assembly will be better coordinate under if program i've directed all the parks including the rec and park department and departments we nominated working together to make...
SFGTV: San Francisco Government Television
99
99
May 29, 2016
05/16
by
SFGTV
quote
eye 99
favorite 0
quote 1
sponsor lacks the authority to trim them back as discussed in the brief there's a double standard in play dpw stated in the january order if someone want to plant new trees staff will not allow the sidewalk is two narrow
sponsor lacks the authority to trim them back as discussed in the brief there's a double standard in play dpw stated in the january order if someone want to plant new trees staff will not allow the sidewalk is two narrow
SFGTV: San Francisco Government Television
66
66
May 31, 2016
05/16
by
SFGTV
tv
eye 66
favorite 0
quote 0
corridors that will we believe not only needs this immediate almost eco implies that mohammed nuru if dpw calls it we come in and try to fix things whether or not broken signs or faded out crosswalks or damaged things on the streets that don't work or anything that might make residents visitors, merchants and others feel unsafe in their neighborhoods needs to be fixed the assembly will be better coordinate under if program i've directed all the parks including the rec and park department and departments we nominated working together to make sure that we fix that's why the fix it teams are announced under the directorship of sandra a very veteran, if you will, within our public works department and have my authority as the mayor to coordinate the departments and get them at a maintenance level when we fix things to maintain them great places like the castro where i often go or mission geneva or chinatown or fillmore all going to be part of these initial 5 neighborhoods in the next 3 years with the budget we have planning and hopefully gets approved in working with the board will be over $6
corridors that will we believe not only needs this immediate almost eco implies that mohammed nuru if dpw calls it we come in and try to fix things whether or not broken signs or faded out crosswalks or damaged things on the streets that don't work or anything that might make residents visitors, merchants and others feel unsafe in their neighborhoods needs to be fixed the assembly will be better coordinate under if program i've directed all the parks including the rec and park department and...
SFGTV: San Francisco Government Television
39
39
May 29, 2016
05/16
by
SFGTV
tv
eye 39
favorite 0
quote 0
close this out i on intersections we left off talking about the difference and the other thing from dpw is paying the in lui fee which is 18 per tree i heard a total of 5541 we can do a check for that you know, i on intersections that chris agrees the site looks at great the trees as we see the projector we had brought up our landscaper architect says that within 5 years a 36 inch box tree will fill out what a 60 inch box they trithis is in 5 years a 60 box tree would have been we're looking to the board to close it this out we're in line with dpw and ada and fta this site looks at good we're looking to close out at the direction of board tonight thank you. >> thank you thank you. >> your number is different than the d s he said 5 at 21 hundred. >> that was the delta so i think the confusing thing with the board is trying to follow kind of a rule book book with the city an in lui fee which is 1890 and the delta of planting a 36 inch tree and a 60 inch my understanding the 36 tree is 29 hundred to plant and a 60 is 5 thousand that is the delta of 10 thousand 5 hundred we were supposed to
close this out i on intersections we left off talking about the difference and the other thing from dpw is paying the in lui fee which is 18 per tree i heard a total of 5541 we can do a check for that you know, i on intersections that chris agrees the site looks at great the trees as we see the projector we had brought up our landscaper architect says that within 5 years a 36 inch box tree will fill out what a 60 inch box they trithis is in 5 years a 60 box tree would have been we're looking to...
SFGTV: San Francisco Government Television
80
80
May 26, 2016
05/16
by
SFGTV
tv
eye 80
favorite 0
quote 0
an ordinance regarding dpw permit reform. it's not a shock to anyone that our construction industry is booming in our city and the sheer amount of construction has a effect on the quality of life. residents are frustrated by the volume of scarce neighborhood parking faces taken away. the frustration are on permanent situations that are taken up when construction is not being done on a project site. we're told of and investigating an issue in district two where a parking space has been reserved for a nonexistent construction projects for 13 years. given these issues, i teamed up with dpw and dbi to do the following first dictate that the duration of a street space occupationy for permanent construction cannot be longer than our building code allows for the work. adds more review before permanent extension and directs the director not to grant it unless there is on going work on the sietd. this proposal would giver in discretion to the dpw director. under this proposal, the directorrer may deny the extension. in addition the pr
an ordinance regarding dpw permit reform. it's not a shock to anyone that our construction industry is booming in our city and the sheer amount of construction has a effect on the quality of life. residents are frustrated by the volume of scarce neighborhood parking faces taken away. the frustration are on permanent situations that are taken up when construction is not being done on a project site. we're told of and investigating an issue in district two where a parking space has been reserved...
SFGTV: San Francisco Government Television
34
34
May 13, 2016
05/16
by
SFGTV
tv
eye 34
favorite 0
quote 0
the size of canister not 18 inches feinstein inches in diameter that's one of the thresholds of the dpw definition to obstruct light and view we tenderloin attached a set of plans to our brief you have a copy. >> but the bottom line here this is similar to equipment that you see on light poles in san francisco including on this very street corner not clear from any of the paragraphs but if you look at intersection on google earth you'll see a utility pole right around the corner no further than the pole we're talking about it operationally is we're talking about visual impact the second thing keep in mind this it is reviewed by 3 departments planning and public works and public health department all included it meets all the standards under the city's code i'll submit to you those finding with correct and more substantial evidence and should be upheld this is a moving target in their brief they raised a single contributor issue notice not a word about that tonight and hope they abandoned it as we pivoted in our brief tonight they want to ask you for time to give them time reengineer our
the size of canister not 18 inches feinstein inches in diameter that's one of the thresholds of the dpw definition to obstruct light and view we tenderloin attached a set of plans to our brief you have a copy. >> but the bottom line here this is similar to equipment that you see on light poles in san francisco including on this very street corner not clear from any of the paragraphs but if you look at intersection on google earth you'll see a utility pole right around the corner no...
SFGTV: San Francisco Government Television
43
43
May 1, 2016
05/16
by
SFGTV
tv
eye 43
favorite 0
quote 0
i would like to note all of our now interim executive director, as well as the dpw staff person working with our project now both have no intention of needing to spend $360 million to finish phase i and both with state today that they believe they can finish phase i with just about 260 million of that 360 million increase, thereby saving a hundred million for phase ii. this slide shows our myriad and various funding sources. we have a federal grant, we have multiple fta grants, we have sales tax from san francisco and san mateo, bridge tolls, a federal tifia loan, land sales and tax increment. this shows how we get to the 247-250 million need. the difference between the 2013 budget and the mtc recommendation is the 360 million. a parcel s sale will close within the next month or two and provide approximately 160 million, which gives us a net shortfall of 200 million. however, we had previously anticipated receiving about 194 million in cfd special tax proveeds. the city has updated those projections and they have come down to 146 million that's expected to be received during the constru
i would like to note all of our now interim executive director, as well as the dpw staff person working with our project now both have no intention of needing to spend $360 million to finish phase i and both with state today that they believe they can finish phase i with just about 260 million of that 360 million increase, thereby saving a hundred million for phase ii. this slide shows our myriad and various funding sources. we have a federal grant, we have multiple fta grants, we have sales...
SFGTV: San Francisco Government Television
44
44
May 27, 2016
05/16
by
SFGTV
tv
eye 44
favorite 0
quote 0
. >> the other thing because you know dpw in the dpw but public works mta is doing a lot so we are workingith the other departments to kind of see those so we'd like to go probably bring those as other projects are you know using the same delivery method. >> i was pleased to see that the controllers all of questions they want to look at are identified all the agencies as far as i'm concerned, so this is something i think we have our eyes open. >> and then the last thing i want to point out for your information my maybe eileen, speak to is one of tt admin cod more complex and you know cpmc. >> let's not talk about that now (laughter). >> you know we're you know pushing it out there and using more delivery methods and traditionally methods. >> thank you. >> other comments on this item? >> public comment? >> yeah. my name is silvia johnson. on this issue i will put emergency response and disadvantage control and management assisted with the areas what major procedures do in for you know mainly terrorists emergency and more border history and sensitive works in management and other process pou
. >> the other thing because you know dpw in the dpw but public works mta is doing a lot so we are workingith the other departments to kind of see those so we'd like to go probably bring those as other projects are you know using the same delivery method. >> i was pleased to see that the controllers all of questions they want to look at are identified all the agencies as far as i'm concerned, so this is something i think we have our eyes open. >> and then the last thing i want...
SFGTV: San Francisco Government Television
43
43
May 1, 2016
05/16
by
SFGTV
tv
eye 43
favorite 0
quote 0
>> i get someone from cal osha and dpw can explain that in more detail. thank you. >> mr. mccarthy. >> james mccarthy, the crane unit from cal osha. >> what is cal osho's role in crane safety and what jurisdiction do you have oppose today the jurisdiction the city has? >> cal osha jurisdiction begins with employee safety and have to have a employer employee relationship to become involved. >> if you raise the microphone a little bit? >> do you need me to repeat what i said? >> no, sir >> the responsibility of cal osha crane unit is assure the crane is particular tower cranes are provided, erected, operated, climbed and dismantled according to the manufacturer recommendation but existing title 8 reguless formulated as a result of the accident in 1999. >> can you tell us about what that failure was? my understanding is that was a nob nab crane that was being jacked up at the time it failed, but in so far as all this comes from that failure 27 years ago, maybe you can tell us about what we learned from that. >> you are absolutely correct. that was a jacking operation which me
>> i get someone from cal osha and dpw can explain that in more detail. thank you. >> mr. mccarthy. >> james mccarthy, the crane unit from cal osha. >> what is cal osho's role in crane safety and what jurisdiction do you have oppose today the jurisdiction the city has? >> cal osha jurisdiction begins with employee safety and have to have a employer employee relationship to become involved. >> if you raise the microphone a little bit? >> do you need me...
SFGTV: San Francisco Government Television
53
53
May 27, 2016
05/16
by
SFGTV
tv
eye 53
favorite 0
quote 0
dpw with their drebter and project management team are going through a exercise looking at all the bids from the different departments inside and outside the agency and what they are finding is bids are between 25 and 30 percent above estimates. it is a difficult exercise for the capital division to put a fine pencil sharp point on estimating even with third party estimators we had 3 firms on this particular project to make sure we cross reference the numbers but when you put it out for bid it is a throwing out into a black box and don't know what you will get back. >> thank you. seeing no other questions, i entertain a motion. >> so moved. >> moved and seconded. all in favor? >> aye >> so moved. >> we are on item 8, galf green fees approval of increase. >> goon morning, tom heart with [inaudible] management. first i would like to start with a couple corrections. i spoke with our city attorney last week to change agenda wording which you have in your packet, but does not match the agenda that went out. the two items have to do with including the effective date july 1 of 2016 and we deci
dpw with their drebter and project management team are going through a exercise looking at all the bids from the different departments inside and outside the agency and what they are finding is bids are between 25 and 30 percent above estimates. it is a difficult exercise for the capital division to put a fine pencil sharp point on estimating even with third party estimators we had 3 firms on this particular project to make sure we cross reference the numbers but when you put it out for bid it...
SFGTV: San Francisco Government Television
100
100
May 29, 2016
05/16
by
SFGTV
tv
eye 100
favorite 0
quote 0
an ordinance regarding dpw permit reform. it's not a shock to anyone that our construction industry is booming in our city and the sheer amount of construction has a effect on the quality of life. residents are frustrated by the volume of scarce neighborhood parking faces taken away. the frustration are on permanent situations that are taken up when construction is not being done on a project site. we're told of and investigating an issue in district two where a parking space has been reserved for a nonexistent construction projects for 13 years. given these issues, i teamed up with dpw and dbi to do the following first dictate that the duration of a street space occupationy for permanent construction cannot be longer than our building code allows for the work. adds more review before permanent extension and directs the director not to grant it unless there is on going work on the sietd. this proposal would giver in discretion to the dpw director. under this proposal, the directorrer may deny the extension. in addition the pr
an ordinance regarding dpw permit reform. it's not a shock to anyone that our construction industry is booming in our city and the sheer amount of construction has a effect on the quality of life. residents are frustrated by the volume of scarce neighborhood parking faces taken away. the frustration are on permanent situations that are taken up when construction is not being done on a project site. we're told of and investigating an issue in district two where a parking space has been reserved...
SFGTV: San Francisco Government Television
116
116
May 3, 2016
05/16
by
SFGTV
tv
eye 116
favorite 0
quote 0
>> i get someone from cal osha and dpw can explain that in more detail. thank you. >> mr. mccarthy. >> james mccarthy, the crane unit from cal osha. >> what is cal osho's role in crane safety and what jurisdiction do you have oppose today the jurisdiction the city has? >> cal osha jurisdiction begins with employee safety and have to have a employer employee relationship to become involved. >> if you raise the microphone a little bit? >> do you need me to repeat what i said? >> no, sir >> the responsibility of cal osha crane unit is assure the crane is particular tower cranes are provided, erected, operated, climbed and dismantled according to the manufacturer recommendation but existing title 8 reguless formulated as a result of the accident in 1999. >> can you tell us about what that failure was? my understanding is that was a nob nab crane that was being jacked up at the time it failed, but in so far as all this comes from that failure 27 years ago, maybe you can tell us about what we learned from that. >> you are absolutely correct. that was a jacking operation which me
>> i get someone from cal osha and dpw can explain that in more detail. thank you. >> mr. mccarthy. >> james mccarthy, the crane unit from cal osha. >> what is cal osho's role in crane safety and what jurisdiction do you have oppose today the jurisdiction the city has? >> cal osha jurisdiction begins with employee safety and have to have a employer employee relationship to become involved. >> if you raise the microphone a little bit? >> do you need me...
SFGTV: San Francisco Government Television
48
48
May 26, 2016
05/16
by
SFGTV
tv
eye 48
favorite 0
quote 0
and our units one ems 6 vehicle per 12 hour shift. >> a partnership with the dpw so we look to expand we need more of that. >> we hope to in the early months it is showing that definitely assisting with freeing up some of the other resources as you may know began ton february 1st i believe the commission asked after the initial presentation perhaps to return with another presentation in roughly 6 months period of time i believe we show results that we think that will warrant expansion of the program. >> i'll agree anything we go cut down on the frequent fliers using our system ero if we triage them in in no way, shape, or form that had been a help to them and our budget. >> thank you commissioner nakajo. >> thank you madam president and deputy chief williams for your comprehensive report i might need information from you deputy director i wanted to ask some related questions to deputy chief williams you were talking about mr. corso about ems and that's what the vice president was talking about coming in on budget. >> yes. >> is that unusual i remember i'm not not saying unusual in the
and our units one ems 6 vehicle per 12 hour shift. >> a partnership with the dpw so we look to expand we need more of that. >> we hope to in the early months it is showing that definitely assisting with freeing up some of the other resources as you may know began ton february 1st i believe the commission asked after the initial presentation perhaps to return with another presentation in roughly 6 months period of time i believe we show results that we think that will warrant...
SFGTV: San Francisco Government Television
53
53
May 9, 2016
05/16
by
SFGTV
tv
eye 53
favorite 0
quote 0
. >> we have dpw to speak here. >> shannon karen from san francisco public works and here before you to seek apruchbl for public works to into into agreement for cal tranls for gement review and approval oof projict initiation initiative. this project features pudpestren and curb extension and sewer and water infrastructure improvements. extoneds along lombard street from van ness avenue to intersection of richardson and fran cyst co street. the execution of the agreement is cal trans [inaudible] cooperative agreement specifies the terms and conditions for city funding contribution of $200,000 to cal trans. fund frg the coopwhich's from a sfmta revenue bond thmpt project document is a engineering decision document that identifies the need, purpose and feasibility of the project. public works began design the project and required cal tran review and approval of the project initiation document to proceed with final design and secure a inroachment for cal trans for construction. as stated in the public worked order dated february 2, 2016 recommend the board approve the agreement includi
. >> we have dpw to speak here. >> shannon karen from san francisco public works and here before you to seek apruchbl for public works to into into agreement for cal tranls for gement review and approval oof projict initiation initiative. this project features pudpestren and curb extension and sewer and water infrastructure improvements. extoneds along lombard street from van ness avenue to intersection of richardson and fran cyst co street. the execution of the agreement is cal...
SFGTV: San Francisco Government Television
80
80
May 7, 2016
05/16
by
SFGTV
tv
eye 80
favorite 0
quote 0
. >> we have dpw to speak here. >> shannon karen from san francisco public works and here before you to seek apruchbl for public works to into into agreement for cal tranls for gement review and approval oof projict initiation initiative. this project features pudpestren and curb extension and sewer and water infrastructure improvements. extoneds along lombard street from van ness avenue to intersection of richardson and fran cyst co street. the execution of the agreement is cal trans [inaudible] cooperative agreement specifies the terms and conditions for city funding contribution of $200,000 to cal trans. fund frg the coopwhich's from a sfmta revenue bond thmpt project document is a engineering decision document that identifies the need, purpose and feasibility of the project. public works began design the project and required cal tran review and approval of the project initiation document to proceed with final design and secure a inroachment for cal trans for construction. as stated in the public worked order dated february 2, 2016 recommend the board approve the agreement includi
. >> we have dpw to speak here. >> shannon karen from san francisco public works and here before you to seek apruchbl for public works to into into agreement for cal tranls for gement review and approval oof projict initiation initiative. this project features pudpestren and curb extension and sewer and water infrastructure improvements. extoneds along lombard street from van ness avenue to intersection of richardson and fran cyst co street. the execution of the agreement is cal...
SFGTV: San Francisco Government Television
97
97
May 8, 2016
05/16
by
SFGTV
tv
eye 97
favorite 0
quote 0
. >> we have dpw to speak here. >> shannon karen from san francisco public works and here before you to seek apruchbl for public works to into into agreement for cal tranls for gement review and approval oof projict initiation initiative. this project features pudpestren and curb extension and sewer and water infrastructure improvements. extoneds along lombard street from van ness avenue to intersection of richardson and fran cyst co street. the execution of the agreement is cal trans [inaudible] cooperative agreement specifies the terms and conditions for city funding contribution of $200,000 to cal trans. fund frg the coopwhich's from a sfmta revenue bond thmpt project document is a engineering decision document that identifies the need, purpose and feasibility of the project. public works began design the project and required cal tran review and approval of the project initiation document to proceed with final design and secure a inroachment for cal trans for construction. as stated in the public worked order dated february 2, 2016 recommend the board approve the agreement includi
. >> we have dpw to speak here. >> shannon karen from san francisco public works and here before you to seek apruchbl for public works to into into agreement for cal tranls for gement review and approval oof projict initiation initiative. this project features pudpestren and curb extension and sewer and water infrastructure improvements. extoneds along lombard street from van ness avenue to intersection of richardson and fran cyst co street. the execution of the agreement is cal...
SFGTV: San Francisco Government Television
69
69
May 3, 2016
05/16
by
SFGTV
tv
eye 69
favorite 0
quote 0
this is sponsored by dpw and mr. up dak is here. and we will turn the mic over to you. >> thank you chair farrell. so this item seeks approval of relocating the material assessing lab to 2000 oak dale, that is a property owned by 1030, polk associates lt and our apoll guapology being different than the name that owns the property, and that is controlled by matthew as the general partner. the materials pesting lab was actually formally located in city hall. if you can believe that. or not. then, it was moved to this current location, at 2099 kearny or the noerlth point plant, that is puc, property. and in order to make way for a new hydraulic pump project at v and they have respectfully requested the public works relocate this operation and so we have been engaged in that process. and so i am joined by both puc and public works officials who can address any questions that you might have about both of the nexus and the reason for the move as well as why this location works very well for public works. if you have questions? >> this ite
this is sponsored by dpw and mr. up dak is here. and we will turn the mic over to you. >> thank you chair farrell. so this item seeks approval of relocating the material assessing lab to 2000 oak dale, that is a property owned by 1030, polk associates lt and our apoll guapology being different than the name that owns the property, and that is controlled by matthew as the general partner. the materials pesting lab was actually formally located in city hall. if you can believe that. or not....
SFGTV: San Francisco Government Television
27
27
May 30, 2016
05/16
by
SFGTV
tv
eye 27
favorite 0
quote 0
is the catch basins that is something that caused a lot of flooding that's why we're out asking the dpw to clear a lot of the capture baselines that didn't has nothing to do with with the capital capacity of the sewers but water can't get into the sewer system so which ties to the definition that that is san francisco entertainment commission but now we're talking about well, if it operationally is able to get into the system the system didn't have the capacity to hold it so what can get sweet spot system flows to the low lying areas but before there are certain areas or areas where water comes through the pipe and pressure through the system. >> on that note in terms of the bowl to understand this is like a trumpet like a horn it is an opening to get do in a storm no matter what is available not able to empty the drain quick enough; correct? >> the bowl on 17th street the graphic bowl. >> so there's a combination had the system is so full it starts of pressureries you can have water coming out of the system into the bowl and stormwater that can't get into the system so you'll end up fl
is the catch basins that is something that caused a lot of flooding that's why we're out asking the dpw to clear a lot of the capture baselines that didn't has nothing to do with with the capital capacity of the sewers but water can't get into the sewer system so which ties to the definition that that is san francisco entertainment commission but now we're talking about well, if it operationally is able to get into the system the system didn't have the capacity to hold it so what can get sweet...
SFGTV: San Francisco Government Television
28
28
May 2, 2016
05/16
by
SFGTV
tv
eye 28
favorite 0
quote 0
intergovernmental agreement between the city and the transbay joint powers authority and that is for dpw to provide construction and oversight services. they've done that, we believe you should just reference, codify that in writing in the resolution. >> colleagues, first can i have a motion to accept the budget analyst's recommendation? >> through the chair i'd like to make a motion for send forth items 4, 5 and 6 and with amendment tothe full board with a positive recommendation. >> motion by supervisor tang tank, second by supervisor yee rr. >> any further business? >> no further business. >> thanks, everybody, we are adjourned. thank you for lettin have time with you. everybody has questions about what we are doing and how we are getting the navigation centers started and some of these improving the [inaudible] but it is about [inaudible] i think all of you are interested in that. i want to let you know [inaudible] also answer any question you have and how you [inaudible] operation here and working citizen center and how we help you do what we can do make sure that we have permanent
intergovernmental agreement between the city and the transbay joint powers authority and that is for dpw to provide construction and oversight services. they've done that, we believe you should just reference, codify that in writing in the resolution. >> colleagues, first can i have a motion to accept the budget analyst's recommendation? >> through the chair i'd like to make a motion for send forth items 4, 5 and 6 and with amendment tothe full board with a positive recommendation....
SFGTV: San Francisco Government Television
50
50
May 29, 2016
05/16
by
SFGTV
tv
eye 50
favorite 0
quote 0
corridors that will we believe not only needs this immediate almost eco implies that mohammed nuru if dpw calls it we come in and try to fix things whether or not broken signs or faded out crosswalks or damaged things on the streets that don't work or anything that might make residents visitors, merchants and others feel unsafe in their neighborhoods needs to be fixed the assembly will be better coordinate under if program i've directed all the parks including the rec and park department and departments we nominated working together to make sure that we fix that's why the fix it teams are announced under the directorship of sandra a very veteran, if you will, within our public works department and have my authority as the mayor to coordinate the departments and get them at a maintenance level when we fix things to maintain them great places like the castro where i often go or mission geneva or chinatown or fillmore all going to be part of these initial 5 neighborhoods in the next 3 years with the budget we have planning and hopefully gets approved in working with the board will be over $6
corridors that will we believe not only needs this immediate almost eco implies that mohammed nuru if dpw calls it we come in and try to fix things whether or not broken signs or faded out crosswalks or damaged things on the streets that don't work or anything that might make residents visitors, merchants and others feel unsafe in their neighborhoods needs to be fixed the assembly will be better coordinate under if program i've directed all the parks including the rec and park department and...
SFGTV: San Francisco Government Television
29
29
May 19, 2016
05/16
by
SFGTV
tv
eye 29
favorite 0
quote 0
our sbc policy is implemented by dpw versus the local policy, right? >> yes. there are federal requirements, minimum that's harmonize with ours. we have done exploration to make sure they are harmonized and we can do that. >> great, thank you. >> commissioner singh, do you have a question. >> yes. how many people are artists that are going to be involved in this? artists? >> i mean the -- obviously your question is not the construction work, how many artists will be involved. the work done will be the main areas of the building. it shouldn't have a huge impact on the studios directly. we're not intending to do renovation of their spaces specifically. this is really about, you know, common areas and exterior areas to provide fire prevention, protection, life safety and accessibility to the building. it's about investing in an asset that is a city owns asset for a lost years. >> looks like a great -- >> there use to be artist faires there once a year. you still have that? >> yes, they have twice a year. the open studios. it's kind of a major event. one in the sp
our sbc policy is implemented by dpw versus the local policy, right? >> yes. there are federal requirements, minimum that's harmonize with ours. we have done exploration to make sure they are harmonized and we can do that. >> great, thank you. >> commissioner singh, do you have a question. >> yes. how many people are artists that are going to be involved in this? artists? >> i mean the -- obviously your question is not the construction work, how many artists will...
SFGTV: San Francisco Government Television
97
97
May 26, 2016
05/16
by
SFGTV
tv
eye 97
favorite 0
quote 0
and our units one ems 6 vehicle per 12 hour shift. >> a partnership with the dpw so we look to expand we need more of that. >> we hope to in the early months it is showing that definitely assisting with freeing up some of the other resources as you may know began ton february 1st i believe the commission asked after the initial presentation perhaps to return with another presentation in roughly 6 months period of time i believe we show results that we think that will warrant expansion of the program. >> i'll agree anything we go cut down on the frequent fliers using our system ero if we triage them in in no way, shape, or form that had been a help to them and our budget. >> thank you commissioner nakajo. >> thank you madam president and deputy chief williams for your comprehensive report i might need information from you deputy director i wanted to ask some related questions to deputy chief williams you were talking about mr. corso about ems and that's what the vice president was talking about coming in on budget. >> yes. >> is that unusual i remember i'm not not saying unusual in the
and our units one ems 6 vehicle per 12 hour shift. >> a partnership with the dpw so we look to expand we need more of that. >> we hope to in the early months it is showing that definitely assisting with freeing up some of the other resources as you may know began ton february 1st i believe the commission asked after the initial presentation perhaps to return with another presentation in roughly 6 months period of time i believe we show results that we think that will warrant...
SFGTV: San Francisco Government Television
64
64
May 24, 2016
05/16
by
SFGTV
tv
eye 64
favorite 0
quote 0
get the tall ignite mike so first of all, i wanted to really recognize herman and dashaun those are dpw employees that are pit stop workers that help to keep your neighborhoods clean up and our public restrooms clean and usable thou for your work and they disrupted a robbery at the chevron we have approval of the minutes inform thank y thank you. your heroic effort. >> (clapping.) >> and he really wanted want to thank mayor ed lee for this upcoming budget to really help to improve our neighborhood and increase cleaning and your ability to ronald to graffiti and broken street lights all the things that degrade the quality of life in a neighborhood it is incredibly important we'll also be able to step up the city's response in terms of entering departmental work to try to contribution people out of the homeless encampments into shuttle and housing and having that entering departmental with the outreach team with the police and department of public works and all people to get people off the streets we know those encampments that are inhuman for people in them are really unhealthy and unsaf
get the tall ignite mike so first of all, i wanted to really recognize herman and dashaun those are dpw employees that are pit stop workers that help to keep your neighborhoods clean up and our public restrooms clean and usable thou for your work and they disrupted a robbery at the chevron we have approval of the minutes inform thank y thank you. your heroic effort. >> (clapping.) >> and he really wanted want to thank mayor ed lee for this upcoming budget to really help to improve...
SFGTV: San Francisco Government Television
70
70
May 22, 2016
05/16
by
SFGTV
tv
eye 70
favorite 0
quote 1
our sbc policy is implemented by dpw versus the local policy, right? >> yes. there are federal requirements, minimum that's harmonize with ours. we have done exploration to make sure they are harmonized and we can do that. >> great, thank you. >> commissioner singh, do you have a question. >> yes. how many people are artists that are going to be involved in this? artists? >> i mean the -- obviously your question is not the construction work, how many artists will be involved. the work done will be the main areas of the building. it shouldn't have a huge impact on the studios directly. we're not intending to do renovation of their spaces specifically. this is really about, you know, common areas and exterior areas to provide fire prevention, protection, life safety and accessibility to the building. it's about investing in an asset that is a city owns asset for a lost years. >> looks like a great -- >> there use to be artist faires thre once a year. you still have that? >> yes, they have twice a year. the open studios. it's kind of a major event. one in the spr
our sbc policy is implemented by dpw versus the local policy, right? >> yes. there are federal requirements, minimum that's harmonize with ours. we have done exploration to make sure they are harmonized and we can do that. >> great, thank you. >> commissioner singh, do you have a question. >> yes. how many people are artists that are going to be involved in this? artists? >> i mean the -- obviously your question is not the construction work, how many artists will...
SFGTV: San Francisco Government Television
45
45
May 25, 2016
05/16
by
SFGTV
tv
eye 45
favorite 0
quote 0
get the tall ignite mike so first of all, i wanted to really recognize herman and dashaun those are dpw employees that are pit stop workers that help to keep your neighborhoods clean up and our public restrooms clean and usable thou for your work and they disrupted a robbery at the chevron we have approval of the minutes inform thank y thank you. your heroic effort. >> (clapping.) >> and he really wanted want to thank mayor ed lee for this upcoming budget to really help to improve our neighborhood and increase cleaning and your ability to ronald to graffiti and broken street lights all the things that degrade the quality of life in a neighborhood it is incredibly important we'll also be able to step up the city's response in terms of entering departmental work to try to contribution people out of the homeless encampments into shuttle and housing and having that entering departmental with the outreach team with the police and department of public works and all people to get people off the streets we know those encampments that are inhuman for people in them are really unhealthy and unsaf
get the tall ignite mike so first of all, i wanted to really recognize herman and dashaun those are dpw employees that are pit stop workers that help to keep your neighborhoods clean up and our public restrooms clean and usable thou for your work and they disrupted a robbery at the chevron we have approval of the minutes inform thank y thank you. your heroic effort. >> (clapping.) >> and he really wanted want to thank mayor ed lee for this upcoming budget to really help to improve...
55
55
May 17, 2016
05/16
by
WTTG
tv
eye 55
favorite 0
quote 0
. >> dpw ask residents that see graffiti dial 311.'s on public property public works can remove it. >> in a ceremony at the white house president obama warded officers with public safety medal of valor for risking their lives to save others. >> sergeant robert wilson iii was honored posthumously. >> in all these places in all these moments these officers were true to their oaths. to a person, each of these honorees acted without regard foth they stood up to dangerous individuals, brand dish aggravated assault rifles, hand guns and knifes. >> public safety medal of valor recognizes police, firefighters and other first responders for exceptional courage. >> well it's a case of good news bad news in montgomery country and in an effort to up schools council decided to cut pay increases for employee unions. >> as a result the county approved more than 2 billion in school funding and the board must use that extra money to trim class sizes and improve presources and the latest move is ahead of two major tax increases and property and home ta
. >> dpw ask residents that see graffiti dial 311.'s on public property public works can remove it. >> in a ceremony at the white house president obama warded officers with public safety medal of valor for risking their lives to save others. >> sergeant robert wilson iii was honored posthumously. >> in all these places in all these moments these officers were true to their oaths. to a person, each of these honorees acted without regard foth they stood up to dangerous...
SFGTV: San Francisco Government Television
69
69
May 6, 2016
05/16
by
SFGTV
tv
eye 69
favorite 0
quote 0
. >> we have dpw to speak here. >> shannon karen from san francisco public works and here before you to seek apruchbl for public works to into into agreement for cal tranls for gement review and approval oof projict initiation initiative. this project features pudpestren and curb extension and sewer and water infrastructure improvements. extoneds along lombard street from van ness avenue to intersection of richardson and fran cyst co street. the execution of the agreement is cal trans [inaudible] cooperative agreement specifies the terms and conditions for city funding contribution of $200,000 to cal trans. fund frg the coopwhich's from a sfmta revenue bond thmpt project document is a engineering decision document that identifies the need, purpose and feasibility of the project. public works began design the project and required cal tran review and approval of the project initiation document to proceed with final design and secure a inroachment for cal trans for construction. as stated in the public worked order dated february 2, 2016 recommend the board approve the agreement includi
. >> we have dpw to speak here. >> shannon karen from san francisco public works and here before you to seek apruchbl for public works to into into agreement for cal tranls for gement review and approval oof projict initiation initiative. this project features pudpestren and curb extension and sewer and water infrastructure improvements. extoneds along lombard street from van ness avenue to intersection of richardson and fran cyst co street. the execution of the agreement is cal...
SFGTV: San Francisco Government Television
203
203
May 23, 2016
05/16
by
SFGTV
tv
eye 203
favorite 0
quote 0
fees that are being waived this year includes dbi's plan review as well as plantings planned review dpwis also waiving the street space permits fee and the fire department is also participating in fee waivers this year on plan review. the upshot of that is that one of these cases, paid a total of $51.50 for some of the fees that are state related, such as the motion fee that cannot be waived. in fact, they saved $650 on the one façade proven made in any other case, they paid $58 in the required fees and save seven $750. i put those out because were early enough in this process that people can still take advantage of it and maybe in your conversations you can remind small business owners in particular, there are advantages they should look into. secondly, what to give you a quick update on the status of the building at asian and 22nd. it was referred to earlier when we were talking but the supervisor speed campos legislation in that building is now about to grade level. the be coming back in designer standard the owners and owners engineer for a permit in order to do the backfilling and
fees that are being waived this year includes dbi's plan review as well as plantings planned review dpwis also waiving the street space permits fee and the fire department is also participating in fee waivers this year on plan review. the upshot of that is that one of these cases, paid a total of $51.50 for some of the fees that are state related, such as the motion fee that cannot be waived. in fact, they saved $650 on the one façade proven made in any other case, they paid $58 in the...
SFGTV: San Francisco Government Television
45
45
May 6, 2016
05/16
by
SFGTV
tv
eye 45
favorite 0
quote 0
one mou that was completed was dpw and they did some work on some alleyways in soma for around $75,000. around christmas the commission reviewed a mou with mocd for 8.2 million dollars to complete some elevator work in some of mocd's housing area projects and also that was, if you recall, mocd is releasing a nofa to solicit some more housing services and then we'll be funding those once they complete the nofa and that is set to be released this spring with the decisions being made later this summer. >> and the one with planning? i guess i'm not seeing it. what is the --. >> that is a slightly different -- these mou's we're talking about here are funded by bond proceeds. the mou with planning is funded through either, depending on the work, so if planning is reviewing plans for, say, the shipyard then we would charge that back to the developer. there is no other funding source because it's a, they were doing work for something outside a project area where there is no developer or they are doing work funded by ocii like in transbay we would use tax increments to pay but these are a speci
one mou that was completed was dpw and they did some work on some alleyways in soma for around $75,000. around christmas the commission reviewed a mou with mocd for 8.2 million dollars to complete some elevator work in some of mocd's housing area projects and also that was, if you recall, mocd is releasing a nofa to solicit some more housing services and then we'll be funding those once they complete the nofa and that is set to be released this spring with the decisions being made later this...
SFGTV: San Francisco Government Television
70
70
May 6, 2016
05/16
by
SFGTV
tv
eye 70
favorite 0
quote 0
is a less much less details and complicated implementation for the management they're using and for dpw i don't know the name the product but a product from a company at excel a it is another product i'm not sure of the name. >> commissioner walker. >> just to clarify the project was stopped because the list of requirements had to be agreed on it keep on changing like a moving target we decided to stop all this assessment of where we are at and what is happening including a timeline sort of the recommendations of how to get back to our original process here and planning has gotten online with their data didn't include an attachment to ours it is really sort of their test case with all their requirements and in process we decide at one point to go live and workout the kings we've not gone live with all the rest of the data that is on our end so we're hoping to capture and blend to the issue of the other departments using a similar or compatible program will it make it definitely with planning they'll be sharing the same database so far as the port not that i'm aware of any and dpw i've h
is a less much less details and complicated implementation for the management they're using and for dpw i don't know the name the product but a product from a company at excel a it is another product i'm not sure of the name. >> commissioner walker. >> just to clarify the project was stopped because the list of requirements had to be agreed on it keep on changing like a moving target we decided to stop all this assessment of where we are at and what is happening including a timeline...
SFGTV: San Francisco Government Television
53
53
May 3, 2016
05/16
by
SFGTV
tv
eye 53
favorite 0
quote 0
department of public works we have hundreds of million dollars of backlog we're currently working with dpw to do a comprehensive assessment of the facilities of our true needs the grond has been huge and an overview of our budget 2016-2017 and 2017-2018 this is the second year we've convened a budget committee some members with us we're grateful for their participation and worked well to have a budget committee from all clarifications as well as areas in the department to come up with different ideas about priority tigdz your needs and that has so far been worked well in relation to the budgeted continued the key priorities and this is something i'm proud of because there's been times we don't agree huge priority by all facets of the department including the administration and fire commission and the presence of the fire commissioner hartman and of the 798 tom o'connor is here all the rough lean economic years question made sacrifices we're all in it together unified asking for doing everything we can to talk about the vehicle replacement plan a plan that went into place in 2009 and passed
department of public works we have hundreds of million dollars of backlog we're currently working with dpw to do a comprehensive assessment of the facilities of our true needs the grond has been huge and an overview of our budget 2016-2017 and 2017-2018 this is the second year we've convened a budget committee some members with us we're grateful for their participation and worked well to have a budget committee from all clarifications as well as areas in the department to come up with different...
SFGTV: San Francisco Government Television
43
43
May 15, 2016
05/16
by
SFGTV
tv
eye 43
favorite 0
quote 0
king up to speak on behalf of dpw. >> >> good morning, everyone, i work at public works.nd just wanted to acknowledge right off the bat that there are a lot of other people present. the city services auditor and public works and recreation and parks and a lot of contractors are present here in case there are questions at the end. before we get into the details i just want to give you a brief overview of where we have been and where we are and where we are going. >> as you probably know by now, it has been almost two years exactly since the city services au iter completed an audit on the construction practices and policies. and in short, the recommendations were to make san francisco do a better job of evaluating the construction project and do a better job of considering past performance and future awards. mark, here in the city services, he wrote that audit. and it was, nationwide, award, winning audit and it has been one of our guiding templates for trying to move forward from there. but really, the big ideas that we want to put on the table, before we get into the weed
king up to speak on behalf of dpw. >> >> good morning, everyone, i work at public works.nd just wanted to acknowledge right off the bat that there are a lot of other people present. the city services auditor and public works and recreation and parks and a lot of contractors are present here in case there are questions at the end. before we get into the details i just want to give you a brief overview of where we have been and where we are and where we are going. >> as you...
SFGTV: San Francisco Government Television
91
91
May 24, 2016
05/16
by
SFGTV
tv
eye 91
favorite 0
quote 0
an ordinance regarding dpw permit reform. it's not a shock to anyone that our construction industry is booming in our city and the sheer amount of construction has a effect on the quality of life. residents are frustrated by the volume of scarce neighborhood parking faces taken away. the frustration are on permanent situations that are taken up when construction is not being done on a project site. we're told of and investigating an issue in district two where a parking space has been reserved for a nonexistent construction projects for 13 years. given these issues, i teamed up with dpw and dbi to do the following first dictate that the duration of a street space occupationy for permanent construction cannot be longer than our building code allows for the work. adds more review before permanent extension and directs the director not to grant it unless there is on going work on the sietd. this proposal would giver in discretion to the dpw director. under this proposal, the directorrer may deny the extension. in addition the pr
an ordinance regarding dpw permit reform. it's not a shock to anyone that our construction industry is booming in our city and the sheer amount of construction has a effect on the quality of life. residents are frustrated by the volume of scarce neighborhood parking faces taken away. the frustration are on permanent situations that are taken up when construction is not being done on a project site. we're told of and investigating an issue in district two where a parking space has been reserved...
SFGTV: San Francisco Government Television
53
53
May 15, 2016
05/16
by
SFGTV
tv
eye 53
favorite 0
quote 0
king up to speak on behalf of dpw. >> >> good morning, everyone, i work at public works.nd just wanted to acknowledge right off the bat that there are a lot of other people present. the city services auditor and public works and recreation and parks and a lot of contractors are present here in case there are questions at the end. before we get into the details i just want to give you a brief overview of where we have been and where we are and where we are going. >> as you probably know by now, it has been almost two years exactly since the city services au iter completed an audit on the construction practices and policies. and in short, the recommendations were to make san francisco do a better job of evaluating the construction project and do a better job of considering past performance and future awards. mark, here in the city services, he wrote that audit. and it was, nationwide, award, winning audit and it has been one of our guiding templates for trying to move forward from there. but really, the big ideas that we want to put on the table, before we get into the weed
king up to speak on behalf of dpw. >> >> good morning, everyone, i work at public works.nd just wanted to acknowledge right off the bat that there are a lot of other people present. the city services auditor and public works and recreation and parks and a lot of contractors are present here in case there are questions at the end. before we get into the details i just want to give you a brief overview of where we have been and where we are and where we are going. >> as you...
SFGTV: San Francisco Government Television
60
60
May 11, 2016
05/16
by
SFGTV
tv
eye 60
favorite 0
quote 0
king up to speak on behalf of dpw. >> >> good morning, everyone, i work at public works.nd just wanted to acknowledge right off the bat that there are a lot of other people present. the city services auditor and public works and recreation and parks and a lot of contractors are present here in case there are questions at the end. before we get into the details i just want to give you a brief overview of where we have been and where we are and where we are going. >> as you probably know by now, it has been almost two years exactly since the city services au iter completed an audit on the construction practices and policies. and in short, the recommendations were to make san francisco do a better job of evaluating the construction project and do a better job of considering past performance and future awards. mark, here in the city services, he wrote that audit. and it was, nationwide, award, winning audit and it has been one of our guiding templates for trying to move forward from there. but really, the big ideas that we want to put on the table, before we get into the weed
king up to speak on behalf of dpw. >> >> good morning, everyone, i work at public works.nd just wanted to acknowledge right off the bat that there are a lot of other people present. the city services auditor and public works and recreation and parks and a lot of contractors are present here in case there are questions at the end. before we get into the details i just want to give you a brief overview of where we have been and where we are and where we are going. >> as you...
SFGTV: San Francisco Government Television
50
50
May 20, 2016
05/16
by
SFGTV
tv
eye 50
favorite 0
quote 0
it also has to go to dpw, puc, good it will go up to maybe 13 stations. each with its backlog, each with its workload. they could be in our department the next three emma four, five months provided it's a good set of plans, provided a respond to comments given in a quick manner. we could probably get them out of the department in three-five months. >> commissioner walker: once the plan comes to us that approved by oh cii, are we able to approve the demolition so that we resolve the outstanding issues >> director: we are. were not allowed to issue it because the new building-it's part and parcel. planning calls it a missing tooth. they don't want a missing tooth in the middle of the block. things happen. things don't get built and then you're stuck with this gap in the block. >> commissioner walker: we are to have a rating of two. >> our city attorney just the opposite. i'm sorry, isn't that what you just said that we could act on emergency demolition? >> commissioner walker: that's different. that process would be separate >> director: will be happy to lo
it also has to go to dpw, puc, good it will go up to maybe 13 stations. each with its backlog, each with its workload. they could be in our department the next three emma four, five months provided it's a good set of plans, provided a respond to comments given in a quick manner. we could probably get them out of the department in three-five months. >> commissioner walker: once the plan comes to us that approved by oh cii, are we able to approve the demolition so that we resolve the...