dufty d bi. the permit was a revision -- sorry, a revision to an earlier permit to reflect the ceiling detail from a previous permit and there was a complaint filed -- probably from the appellant here and the issues and we investigated it. our building inspector ed donnley was there and met mr. o brien and we opened up ceiling to check for insulation. there was confusion in one of the inspections and from my recollection everything was satisfied in the building code in what we wanted and the assembly on the ceiling and one layer insulation between the ceiling joyce and sheet rock and rc channel and another layer of sheet rock. can you use several layers to do that and per the code they're okay from us. there were a couple other permit for the change of use and revision permit as well, but as of now i believe the gym is -- we have given them a temporary certificate of occupancy and waiting clearance of this and we will close out the permits. that's the information i have from the district inspecto