already now , on the banks of the dunayev river in close proximity to the existing nuclear facility,le earthworks are underway for each power unit , it will be necessary to develop 900,000 cubic meters of soil. now, our work is mostly mechanized, so there is not such a huge number of people, but by the end of next year, about 1,600 people will be working here, and in peak, that is, when the equipment of the second one is already being installed on the first block , it will be about . there from 14 to 16.000 a person will work here, a construction site is being prepared for the next important stage of soil strengthening, it will be brought in using deep mixing technology, which has proven itself well during construction , the course of construction. pfz, will protect against the penetration of groundwater. so the working site of the pit, and the already operating power units. a ispaksh-1. well, there is also groundwater directly, which goes in the ground to the water-bearing layer and is directly what we have here, the supply channel operates as a bypass station, that is, against filt