. >> the locations of the windows were discussed and vetted by dvi at a pre-application meeting and atthe next stage of thepermit issuing . the location was chosen based on consultation with consultants who gave input on the repairs for the east wall. and as noted by appellants at the beginning of the outset and by the public comment or, these bathroom windows were proposed to be frosted but were changed at therequest of the appellant . and the appellants keep moving the goal posts, now that they've gotten their glass windows and now have an issue with the size and location of the windows and the ho a has spent a considerable amount of time analyzing and determining the proposed design of the windows based on consultation with consultants and the pre-application with you guys but the size of the windows chosen was done for creating greater conformity at theho a boat on the east wall and the greater community .the board, i understand and appreciate the desire for the windows but it's a common wall that's being repaired for the greater good ofthe entire development . concludes my present