[no audio] >> otc, ecl. >> ecl? >> just a heads up, we're about to begin pressurization, there will be a master alarm. >> copy. cdr, you copy? >> we copy, otc. thanks. >> okay, george. it sounds like they just got the go, so they're going to start bringing up pressure. the commander gave them the pressure inside the vehicle right now. ecl's calculating that pressure. they'll open the gauge, open the valve, and they'll start pressurizing the crew module. that's what rene's doing right now. he's talking to ecl engineering. the probe's hooked up, they're ready for pressurization. >> rcrt, otc? >> ccse. >> yes. can you guys go to 232 for a spin to high power? >> yes, ma'am. >> and, tim, what they're about to do right now is to take the mile tracking station, the big tracking antennas are now going to be going from low power to the high power mode, so that's what that direction was because that's about to happen. it usually happens at about 55 minutes, t-minus 55, and we're coming up on that in about 40 seconds. so that'