opens up great prospects for long-term cooperation signed by the representatives of rosatom on the egozthe south american republic will be built an industrial complex with a production capacity of up to 25,000 tons of lithium carbonate per year - this is about 4% of the entire world market to get a contractor with the atom participated in the tener. more than 20 companies have claimed to mine lithium, which is necessary for various special industries , the need for it is growing. there are still many plans to increase the production volume of e -batteries in the first place for transport to date products kamaz belaz uh, use our drives uh