pilar a data elisse phillis as the job was completed within two weeks and the homeowner can demolition and understood this is an issue and it is the one that we and the this area is the 3r. did is very simple. if that happens at the issuance, we cannot update that. it was issued after completion happened. as for illegal use -- as for legal use, this was one of the biggest challenges for us. let's say that they came back to us all 42 from the dwelling. -- for a two family dwelling. let's say that we need the applicants to provide us with property cards and water records. that will help us to see how come it becomes too as opposed to one-family dwelling. after picking the document we do and other research, just to make sure. we provide a package with that the building permit. every document that we have. we bring it up to the dirt -- deputy director of inspection services. we handed to him. he will look through all the documentation and give that determination. yes, this can be a legal close family dwelling. >> does that accommodate the fee structure? when an inspection has to be made of