we will hear from ms. , eliza nemser. you have three minutes. >> good evening, and welcome. >> overhead please. >> good evening. article 25 exists and permitting process, compliance standards, veal process exist to protect our city and its residents. unfortunately verizon has shown a disregard for the integrity of this process to get the fact they sent a sub contractor to string cable to this poll before the permit was even approved. with a foregone conclusion they would obtain the permit. there has been a failure in all levels of this assets. a shadow cast, with a disapproval of a 44 design in march. the approval of the same design in july with no rational basis. and the failure to review this and permits at the planning protected location as part of the historic district. there have been numerous representations as pivotal it affects you. the board of appeals, tainting these proceedings. residents have had to spend time and resources to eliminate these failures. this isn't a one-off project. our city and its residents d