SFGTV2: San Francisco Government Television
47
47
May 9, 2013
05/13
by
SFGTV2
tv
eye 47
favorite 0
quote 0
it seemed to be concentrated along the embarcadaro. >> correct. there was 3 to 4 story development along the embarcadaro, similar to what we're proposing and cruise terminal was the highest element of that project. that topped out around 85 feet on the east edge of the pier and we're obviously 125. >> thank you. so, thank you. i think this has been a great presentation and appreciate the work done since the last presentation. it would be great, too, after commissioner comments to get the staff's -- your reaction to kind of where -- how the design has evolved. >> >> commissioner sugaya. >> yes, for informational purposes, the tower ~ at&t park are 222 feet high approximately. and i believe the upper decks are a little taller than. and obviously the light standards are much taller than that. so, that's for comparison purposes. i just have a question for staff, i think, in terms of future scheduling, in terms of the design, in terms of the e-i-r, and when we're anticipating this coming before the commission for any kind of -- i know we don't have app
it seemed to be concentrated along the embarcadaro. >> correct. there was 3 to 4 story development along the embarcadaro, similar to what we're proposing and cruise terminal was the highest element of that project. that topped out around 85 feet on the east edge of the pier and we're obviously 125. >> thank you. so, thank you. i think this has been a great presentation and appreciate the work done since the last presentation. it would be great, too, after commissioner comments to...
SFGTV: San Francisco Government Television
49
49
May 18, 2013
05/13
by
SFGTV
tv
eye 49
favorite 0
quote 0
so, it creates a much more dense wall to the experience along the embarcadaro. then the event center does because we pulled it so far away. we're still working on these diagrams. but there you can see the two of them over the top of each other. there's the seawall site and we're finished now. just [speaker not understood]. a little glass bridge that goes across between the two hotel components. there is a 40 foot high podium that runs between the residential and the hotel component that's no higher than the water mark podium that exists today so we're staying with that level. it's also lower than many of the other podiums that move up and down along the embarcadaro in this particular place. our key feature here that is we don't want to have kind of a flat top across the entire site. we want to create a little bit of variety in scale and forms as you move along the embarcadaro as you move along this stretch. i believe that is the last image. thank you. >> very impressive how you ran through that. thank you. [laughter] >> i didn't want the beeper to go off. thank
so, it creates a much more dense wall to the experience along the embarcadaro. then the event center does because we pulled it so far away. we're still working on these diagrams. but there you can see the two of them over the top of each other. there's the seawall site and we're finished now. just [speaker not understood]. a little glass bridge that goes across between the two hotel components. there is a 40 foot high podium that runs between the residential and the hotel component that's no...
SFGTV: San Francisco Government Television
42
42
May 13, 2013
05/13
by
SFGTV
tv
eye 42
favorite 0
quote 0
we want to create a little bit of variety in scale and forms as you move along the embarcadaro as you move along this stretch. i believe that is the last image. thank you. >> very impressive how you ran through that. thank you. [laughter] >> i didn't want the beeper to go off. thank you. commissioner, thank you for allowing me to extend a little bit of extra time. and they may have questions for you, but thank you. are there any other staff or project sponsor comments? okay. we're going to open it up for public comment. denise mc kenzie. jacquelyn flynn. jim lazarus. robert graham. fred jordan. and patrick valentino. >>> thank you, commissioners. i'm dennis mc kenzie, diamond consulting education. if you can put this image up on the screen. as the planning commission and other city and state agencies continue to analyze and refine this warriors multi-purpose cultural center and arena, i've been proposing to the warriors to work in collaboration with the san francisco government agencies and community leaders to integrate within the original design and construction of this state-of-the
we want to create a little bit of variety in scale and forms as you move along the embarcadaro as you move along this stretch. i believe that is the last image. thank you. >> very impressive how you ran through that. thank you. [laughter] >> i didn't want the beeper to go off. thank you. commissioner, thank you for allowing me to extend a little bit of extra time. and they may have questions for you, but thank you. are there any other staff or project sponsor comments? okay. we're...
SFGTV2: San Francisco Government Television
38
38
May 9, 2013
05/13
by
SFGTV2
tv
eye 38
favorite 0
quote 0
on the embarcadaro itself, we're bringing them all the way up and not just single file. there's plenty of room to queue them, multiple people per line, bringing this them up around the cruise ship terminal itself and downed in the venue itself. >> can you address the question raised with respect to the trucks and the movement? is that live nation's issue -- responsibility? >>> [speaker not understood]. the port-a-johns industry standard -- >> did you say -- >>> a couple things. the port a agenda ~ port-a-johns [speaker not understood] they'll pull in to empty those after every event. >> so, midnight. >>> yes, but inside the venue, inside the pier itself. not externally. >> okay. what about the -- and maybe this is for -- the anticipated traffic issue around the lombard, battery and the embarcadaro. have you been participating in those discussions? >>> yeah, i think lea is better suited -- >> can i get an answer? apparently details have not been sent out or provided to us according to the public commenter. >>> i was present at the meeting just this past week and really th
on the embarcadaro itself, we're bringing them all the way up and not just single file. there's plenty of room to queue them, multiple people per line, bringing this them up around the cruise ship terminal itself and downed in the venue itself. >> can you address the question raised with respect to the trucks and the movement? is that live nation's issue -- responsibility? >>> [speaker not understood]. the port-a-johns industry standard -- >> did you say -- >>> a...
SFGTV: San Francisco Government Television
46
46
May 18, 2013
05/13
by
SFGTV
tv
eye 46
favorite 0
quote 0
so, it creates a much more dense wall to the experience along the embarcadaro. then the event center does because we pulled it so far away. we're still working on these diagrams. but there you can see the two of them over the top of each other. there's the seawall site and we're finished now. just [speaker not u
so, it creates a much more dense wall to the experience along the embarcadaro. then the event center does because we pulled it so far away. we're still working on these diagrams. but there you can see the two of them over the top of each other. there's the seawall site and we're finished now. just [speaker not u
SFGTV: San Francisco Government Television
52
52
May 11, 2013
05/13
by
SFGTV
tv
eye 52
favorite 0
quote 0
so, it creates a much more dense wall to the experience along the embarcadaro. then the event center does because we pulled it so far away. we're still working on these diagrams. but there you can see the two of them over the top of each other. there's the seawall site and we're finished now. just [speaker not understood]. a little glass bridge that goes across between the two hotel components. there is a 40 foot high podium that runs between the residential and the hotel component that's no higher than the water mark podium that exists today so we're staying with that level. it's also lower than many
so, it creates a much more dense wall to the experience along the embarcadaro. then the event center does because we pulled it so far away. we're still working on these diagrams. but there you can see the two of them over the top of each other. there's the seawall site and we're finished now. just [speaker not understood]. a little glass bridge that goes across between the two hotel components. there is a 40 foot high podium that runs between the residential and the hotel component that's no...
SFGTV: San Francisco Government Television
35
35
May 18, 2013
05/13
by
SFGTV
tv
eye 35
favorite 0
quote 0
and it's both side of the embarcadaro that we are involved in, all agencies. >> i'm talking about the specific planning part because port has spent a tremendous amount of time creating continuity and language of open space and kind of flood themselves from where you are all the way out up to pier 70. >> okay. any additional comments? okay, thank you. the commission is going to take a short break and reconvene in about 15, 20 minutes. >>please stand by; meeting in recess regular hearing for may 2013. i'd like to remind the members of the public the commission does not tolerate any outbursts or disruptions of any kind. if you have any mobile devices that may sound off during these proceedings, please silence them or turn them off. and when speaking before the commission please do state your name for the record. commissioners, we left off under your regular calendar item 12, plan bay area. >> commissioner, [speaker not understood] with the planning department. i'm here to brief you on plan bay area which is the sustainable communities strategy for our region. this arose out of senate bil
and it's both side of the embarcadaro that we are involved in, all agencies. >> i'm talking about the specific planning part because port has spent a tremendous amount of time creating continuity and language of open space and kind of flood themselves from where you are all the way out up to pier 70. >> okay. any additional comments? okay, thank you. the commission is going to take a short break and reconvene in about 15, 20 minutes. >>please stand by; meeting in recess...
SFGTV2: San Francisco Government Television
66
66
May 9, 2013
05/13
by
SFGTV2
tv
eye 66
favorite 0
quote 0
used, fisherman's wharf that we all recognize and of course now to the ferry building once the embarcadaro has been removed. there is the next point that really is china basin where at&t park is, below that pier 70 is for review for development. ~ under review for development. i wouldn't call it a gap, but a long space that interrupts this rhythm of architectural features along the water front that punctuate one's experience as you walk along the bay. you might felt that yourself. our proposal is not just to create meaningful waterfront access, but also to create something that feels in line with the rhythm of architectural features that define the shoreline as we see san francisco today. so, that was just one small point we wanted to raise in terms of the larger urban vision that the project represents in addition to waterfront access. the next thing to point out is that there is a tremendous focus being put on the development of this pier in terms of managing the pollutants and other issues that are being sort of -- i would say are component of the decay of the pier as it sits today and
used, fisherman's wharf that we all recognize and of course now to the ferry building once the embarcadaro has been removed. there is the next point that really is china basin where at&t park is, below that pier 70 is for review for development. ~ under review for development. i wouldn't call it a gap, but a long space that interrupts this rhythm of architectural features along the water front that punctuate one's experience as you walk along the bay. you might felt that yourself. our...
SFGTV: San Francisco Government Television
62
62
May 12, 2013
05/13
by
SFGTV
tv
eye 62
favorite 0
quote 0
the embarcadaro, of course. the second sound meter person will have a decibel meter and will measure the decibels throughout the course of the event in various places throughout the neighborhood. so, they'll go to 101 lombard, measure the decibels. they'll go to a different residence. they'll measure the decibels. one of the things we're doing with the [speaker not understood] organization is setting what the ambient decibel levels are. i am also not a sound acoustic ition and that's why we're hiring the best in san francisco over the first couple of shows to develop what is the baseline now, what is the baseline for a concert and is it within the reasonable limits. >> and do you have a written plan of where these people are going to be and regarding when they are checking decibels in the neighborhood? >>> there are a number of individuals in the neighborhood that have already volunteered for the residences to be used. so we're developing that plan with charles salter now. >> thank you. >>> thank you. >> one of
the embarcadaro, of course. the second sound meter person will have a decibel meter and will measure the decibels throughout the course of the event in various places throughout the neighborhood. so, they'll go to 101 lombard, measure the decibels. they'll go to a different residence. they'll measure the decibels. one of the things we're doing with the [speaker not understood] organization is setting what the ambient decibel levels are. i am also not a sound acoustic ition and that's why we're...
SFGTV2: San Francisco Government Television
79
79
May 9, 2013
05/13
by
SFGTV2
tv
eye 79
favorite 0
quote 0
america's cup event authority have created a queueing plan that really takes people off of the embarcadaro proper itself, which is really something that we support because when you add people with cars, it's never a good mix. so, we're confident that we're not going to have that kind of a situation with queueing and that it is going to be occurring on the america's cup venue property. >> so, you would say that plan is in place 1234 >>> yes. >> and related ~ in a letter from mr. barkly, the america's cup and live nation will work with, although i think there is a separate letter that says, will make best efforts, with sfmta and sfpd to deliver a neighborhood traffic and parking plan before the first concert. would you say that that is now in place as well? >>> yes, i would. we had another meeting last week where i presented our -- with the steering committee where i presented our transit plan and our enforcement plan to deal with traffic mitigation. >> thank you. >> one of the public commenters spoke to trucks going -- operating at work hours versus in the middle of the night. is that withi
america's cup event authority have created a queueing plan that really takes people off of the embarcadaro proper itself, which is really something that we support because when you add people with cars, it's never a good mix. so, we're confident that we're not going to have that kind of a situation with queueing and that it is going to be occurring on the america's cup venue property. >> so, you would say that plan is in place 1234 >>> yes. >> and related ~ in a letter from...
SFGTV2: San Francisco Government Television
58
58
May 17, 2013
05/13
by
SFGTV2
tv
eye 58
favorite 0
quote 0
in this new neighborhood, here along the embarcadaro, the san francisco exporatorium is truly reborn bigger and better than ever, and we know in this new location and facility and sort of a new sense of enthusiasm it is going to be a huge success and a integral part of what visitors come to enjoy in san francisco and of course what all residents in the bay area come to enjoy. it is fantastic, i know that my kids used to love to come visit. i know that they will be excited and they are kind of big now and they will be excited to come and visit this new facility as well. we just aired and i want to remind for those of who you did not see it, i did a half hour special, thank you very much. [ applause ] and it is not, a shameless plug r the special, i promise you, it is a celebration of what was done here, we worked really hard to capture the enthusiasm and the quality of the exhibits and all of the deep thought and love and care that went into creating this new facility and it is just an exciting look at what has been done, so if you have not seen it, it will air the 28th, a week from t
in this new neighborhood, here along the embarcadaro, the san francisco exporatorium is truly reborn bigger and better than ever, and we know in this new location and facility and sort of a new sense of enthusiasm it is going to be a huge success and a integral part of what visitors come to enjoy in san francisco and of course what all residents in the bay area come to enjoy. it is fantastic, i know that my kids used to love to come visit. i know that they will be excited and they are kind of...
SFGTV2: San Francisco Government Television
55
55
May 2, 2013
05/13
by
SFGTV2
tv
eye 55
favorite 0
quote 0
about a year ago and destroyed the front part of the bulkhead part of the building which faces the embarcadaro. and, so, it was fast tracked through the port and the city approval process and it was completed just the end of last week, i believe. and staff went over earlier this week to take a look at finished product. so, that one has also been completed. and then just a quickie to planning staff. could we get a copy of the mta polk street alternatives that were part of the community discussion earlier this week? thank you. >> any additional comments, questions? okay, next item, please. >> commissioners, it will place you under department matters. item 7, director's announcements. >> thank you. jonas, good afternoon, commissioners. a couple things. as noted in your director's report, the recent landmark district was created along market street of a 8 discontiguous buildings being called the post 1906 reconstruction projects that did go through the board and took effect recently. it is a series of masonry buildings on market street that you supported as well as the historic preservation commis
about a year ago and destroyed the front part of the bulkhead part of the building which faces the embarcadaro. and, so, it was fast tracked through the port and the city approval process and it was completed just the end of last week, i believe. and staff went over earlier this week to take a look at finished product. so, that one has also been completed. and then just a quickie to planning staff. could we get a copy of the mta polk street alternatives that were part of the community...
SFGTV: San Francisco Government Television
43
43
May 3, 2013
05/13
by
SFGTV
tv
eye 43
favorite 0
quote 0
and it is exciting to see the development on the water front embarcadaro. >> i broke into the trades early on in my career, just down the street at the old shipyard and my father was a bottler in the brewery and you hear that it will be part of this project is a win/win, unfortunately my father is no longer here. but he has told me the stories of the days, back in the 60s and in the 50s. and again, i am in full support of this, not only for the residents, of san francisco, but for the new opportunities that are going to arise for the local higher, and also the apprentices that have been shut out of the projects for the last few years due to the down turn in the economy. i think that this project with the amount of square footage and the development of the whole water front is key to the survival of the programs that are here in san francisco. and also, to have a project like this, just steps away from the dog patch and also from south of market, and to be able to stroll from the ballpark right across the street and be able to enjoy the parks that are in this development. i would enco
and it is exciting to see the development on the water front embarcadaro. >> i broke into the trades early on in my career, just down the street at the old shipyard and my father was a bottler in the brewery and you hear that it will be part of this project is a win/win, unfortunately my father is no longer here. but he has told me the stories of the days, back in the 60s and in the 50s. and again, i am in full support of this, not only for the residents, of san francisco, but for the new...
SFGTV: San Francisco Government Television
66
66
May 8, 2013
05/13
by
SFGTV
tv
eye 66
favorite 0
quote 0
be a 30-year, 40-year out plan to get to the point where you could get from ocean beach to the embarcadaro in 25 minutes. and i know that we have to start planning in order to do that and we have to start making those changes and we have to identify what those changes are going to be and that there will be support for them, not just from the public, but from our elected officials as well. and i'm wondering, do we have any process -- i know we talked awhile ago about some level of c-e-q-a reform that can help us see that our internal projects. do we feel like that's progressing to the point where it really is going to start to be a benefit? i know when we talked about this, director heinicke brought up the point if we do achieve some reform that will allow us to speed up improvements, that it is going to make more sense to wait until we've got that reform and then embark on those changes. can i just get a little sense from you what we're feeling on that? because when i look at some of the projects that we're working on now, i feel like this is incredibly daunting. >> yes. so, the time frame
be a 30-year, 40-year out plan to get to the point where you could get from ocean beach to the embarcadaro in 25 minutes. and i know that we have to start planning in order to do that and we have to start making those changes and we have to identify what those changes are going to be and that there will be support for them, not just from the public, but from our elected officials as well. and i'm wondering, do we have any process -- i know we talked awhile ago about some level of c-e-q-a reform...
SFGTV2: San Francisco Government Television
45
45
May 9, 2013
05/13
by
SFGTV2
tv
eye 45
favorite 0
quote 0
system and what are the types of [speaker not understood] to deal with the bottleneck be it the embarcadaro turn around or west portal and where [speaker not understood] come together. i mentioned how there's shortfalls that remain for many projects and a couple of -- there's an entire advocacy platform that the region has put together to couple to highlight of particular note, one is cap and trade as an entirely new revenue source and there's been some talk at the region of let's make sure the region is clear what our priorities are so we can make sure that we're successful in bringing down a share of the cap and trade revenues locally. and secondly, sarah talked a little about this, the challenge of this goal of achieving all of the housing needs by income level and the region. the plan is predicated on assuming there is some sort of a replacement to the redevelopment tool that was lost. so, that's something that i know there will be a lot of attention on, trying to achieve that in the coming years. and finally, i talked a little about how the -- we go from this 28-year general idea of ho
system and what are the types of [speaker not understood] to deal with the bottleneck be it the embarcadaro turn around or west portal and where [speaker not understood] come together. i mentioned how there's shortfalls that remain for many projects and a couple of -- there's an entire advocacy platform that the region has put together to couple to highlight of particular note, one is cap and trade as an entirely new revenue source and there's been some talk at the region of let's make sure the...