embarcadero currently supplying power from the mid-market substations and through those soils. repair could take eight hours to several weeks. maintaining the embarcadero station is critical to the san francisco downtown and waterfront region. the system of reliability was raised during the study interview with pg&e in november 2011 and pg&e followed up with the council getting support to ada third connection to the embarcadero station with this going to the portero substation and improve system reliability particularly into the downtown area in a major earthquake and allow pg&e more flexibility with work and unexpected equipment outages. they gave three routes and options to provide feedback and you can see from the box, the green, red and blue routes so pg&e is continuing to work with the city and the project design and the approval process and hopes to begin work in 2014 or 2015. so looking ahead we will be completing the life line interdependences study in 2013. we are also in the process of developing a work program then. in the last meeting in september we asked participan