839
839
Sep 29, 2011
09/11
by
KQED
tv
eye 839
favorite 0
quote 1
test kitchen chefs julia collin-davison, bridget lancaster, becky hays, with adam ried in the equipment corner
test kitchen chefs julia collin-davison, bridget lancaster, becky hays, with adam ried in the equipment corner
141
141
Sep 22, 2011
09/11
by
KQED
tv
eye 141
favorite 0
quote 0
test kitchen chefs julia collin-davison, bridget lancaster, becky hays, with adam ried in the equipment corner and jack bishop in the tasting lab. discover the secrets of
test kitchen chefs julia collin-davison, bridget lancaster, becky hays, with adam ried in the equipment corner and jack bishop in the tasting lab. discover the secrets of
SFGTV: San Francisco Government Television
78
78
Sep 24, 2011
09/11
by
SFGTV
tv
eye 78
favorite 0
quote 0
equipment cabinets as part of the wireless transmission network operated by at&t. we have a zoning district. the project is located at 539 bryant street at the southwest corner of bryant and zoe street. the current use of the building, the four-story building is as an office. commissioners, the staff has received multiple letters and calls regarding this proposal. those in opposition cite health concerns and a loss of potential property value in the surrounding area. again, i have some additional letters that were sent in to me and i have them here for your review at this moment. commissioners, the proposed project is consistent with the 1996 wireless transmission citing guidelines. the proposed location is classified as a preferred site with the location preference number four being a wholly commercial structure. holding a community highway meeting to residents within 500 feet of the proposed location. this was done in may 2011. commissioner, the proposed project will assist in maintaining a complete and comprehensive wireless telecommunications network. it is in demand and serves the public good. the staff recommends approval with standard conditions. this
equipment cabinets as part of the wireless transmission network operated by at&t. we have a zoning district. the project is located at 539 bryant street at the southwest corner of bryant and zoe street. the current use of the building, the four-story building is as an office. commissioners, the staff has received multiple letters and calls regarding this proposal. those in opposition cite health concerns and a loss of potential property value in the surrounding area. again, i have some...
SFGTV: San Francisco Government Television
256
256
Sep 13, 2011
09/11
by
SFGTV
tv
eye 256
favorite 0
quote 0
corner of the right hand picture. that gives them a level, clean place to set up for their buttress drilling. that is the area of the buttress that will be going in. the equipment on site, talk about it in a minute. the rest of the site they continue to put together shoring wall beams. they are about 1/3 of the way through with the number of beams. they need over 800 for the entire 30-foot shoring wall. they are about 1/3 of the way through putting this together. you can see the additional work at the far west end. they started doing pre-trenching on ministry and some work on anchor. you can see they are mobilizing their second shoring wall brick. they have started a test panel with that rig this past week. that is a shot clean out to the bay going south from the project where we remove all the ramps. really no change other than the demolition contract finished up by removing the tree, and now, the bse contractor has been able to relocate their office trailers out there and set up so they can work on the west end of the project. as i said, there is some remaining demolition of the additional building. this slide shows the basic schedule of when those will all b
corner of the right hand picture. that gives them a level, clean place to set up for their buttress drilling. that is the area of the buttress that will be going in. the equipment on site, talk about it in a minute. the rest of the site they continue to put together shoring wall beams. they are about 1/3 of the way through with the number of beams. they need over 800 for the entire 30-foot shoring wall. they are about 1/3 of the way through putting this together. you can see the additional work...
566
566
Sep 15, 2011
09/11
by
KGO
tv
eye 566
favorite 0
quote 0
equipment problems there. hot spot drive times continued slow traffic 84 and 580. >>> sue, regis: hi everybody, it's thursday, september 15, 2011. here we are on the corner regis: it really is. why is it exciting? kelly: because today we have a huge show. we from the new series "new girl," zooey deschanel, and from
equipment problems there. hot spot drive times continued slow traffic 84 and 580. >>> sue, regis: hi everybody, it's thursday, september 15, 2011. here we are on the corner regis: it really is. why is it exciting? kelly: because today we have a huge show. we from the new series "new girl," zooey deschanel, and from