proposal for the shipyard located at pier 68 and 70 lot 329 including dry dock number 2 and dry dock eurekaaeffy bower. requesting for approval of 9a which is the second request for proposal to operate and lease are the dry dock. as you recall in the summer of 2017, this commission authorized port taaffe to issue the first proposal for the shipyard. it was issued august are 15th, 2017. the port received -- we received three respondents only one was actually responsive. the other two were letters and really inquiries. the respondent was from vigor and the other two were from [inaudible] the port is seeking a tenant that can demonstrate the ability to modernize and operate the shipyard and assets through the life of the lease and to achieve the port strategic goals of renewal,al stability, economic, vial at that time, engagement and liveability. what are the key terms of the rfp? that is the real key here. sorry. the port is suggesting in the new rfp a smaller footprint which would reduce the operator's maintenance and repair cost for the buildings that are not actually required to operate the