responsible bidder submitting the lowest responsive bid in the amount of $481,785 for tg15.2: façade access equipment thereby increasing authorized direct costs by $481,785, and the authorized construction services fixed fee by $36,616. >> >> and mark will also report on this item. >> and this scope of work for the was it, do you see it on the screens? >> sorry about that. >> the scope of work for the package of 15.2, is to provide the david and the cranes for the window washing system on the west end and to provide the fall arrest protection systems at the various structures of the roof support and we have a lot of structures on the roof top and they will provide the full air systems for that and the scope of work provides a three year warrantcy, and it was issued for a bid on august 7th, and the budget was 334, 458 and the estimates was 387,220, and the package had a five percent goal and prequalified and two bids, and one for 313,000 and one for 481,785 on october 15th and this is a break down of the two bids and submitted for the bids for 481,785 for the bid for $313,000, and the estimate was 383