very fgrueling, intense, and a dangerous operation. the leak on the street actually occurred right at mission on the embarcadero. it was just short of the ferry building. we currently have the elite under control. this is the weekly had a year ago, over a year ago of a near jackson streets. this is the same fix that we implemented here at mission street. what you see are compression bands and rubber seals. against all these things. -- they installed these things. we had to dam the sewweer system at samson and jackson, that allowed us to pump about 3 million gallons a day into the central basin, and you see them at their where we were blocking stevenson for a time. this is a pretty monumental effort between the water department and waste water crews. this allowed us to make this happen. they were blocking deliveries to the system, there is a little picture here. we have moved to the pump around with a wheat field test, we are still monitoring the situation, we are going to get out there and do more detections in the next week to verify