the folsom piety is -- pilot is going to be opened up this year. >> where are these projects. >> i have got them underlined. >> really quick, how did you come to determine that these were your priorities? >> these from the bike plan from the 2006 bicycle plan and we are at the tail end of the bicycle plan and we are releasing all the projects and now we are going to a dramatic set of projects now. >> the projects that are in design you have a lot of stuff at least two, 16 street and caesar chavez connecting from east to west but nothing from north to south. i have heard a lot of complaints and challenges around illinois that are part of 3rd street. >> that is part of the design upgrade. as far as these projects now, we are developing two categories of improvements and we'll be working with many stake holders to develop that. one is to close the gaps in the existing network and the second category is to create to identify the gap closures that doesn't exist now. even to identify these, where the gap is going to be closed an some of the east and west connection in the eastern neighborhood